Meeting Date: December 11, 2000
Staff Contact: Dave Dettman General Counsel Approval: N/A
|
Budgeted: N/A
Program/Line Item No.: N/A Cost Estimate: N/A |
Exhibit A shows the anticipated
production by Cal-Am for each production source. Exhibit
A also shows actual production values for the water year to
date. Please note that the anticipated production values for the January
through March 2001 period have been set to meet the goals established by
the State Water Resources Control Board (SWRCB) in Orders No. WR 95-10
and 98-04. Accordingly, the anticipated annual Cal-Am production values
in
Exhibit A total 15,285
AF, including 4,000 AF from the Seaside Basin and 11,285 AF from the Carmel
River Basin. The production values include production from the Water West
(WDS), which was integrated into the Cal-Am system in 1993.
RECOMMENDATION: The Board should receive
public input, close the Public Hearing, and discuss the proposed water
supply budget. Staff recommends adoption of the proposed budget. The budget
is described in greater detail in
Exhibit
B, Quarterly Water Supply Strategy Report: January - March
2001.
BACKGROUND: The Quarterly Water Supply
Strategy and Budget pertains to production within the Cal-Am Water Distribution
System for the three-month period of January, February, and March 2001.
This strategy was developed
cooperatively with staff from the District,
Cal-Am, and the California Department of Fish and Game (CDFG) and the National
Marine Fisheries Service (NMFS). With the anticipated spillage of San Clemente
and Los Padres Dams in December 2000, it was agreed that Cal-Am's diversion
from San Clemente Reservoir through the Carmel Valley Filter Plant would
be limited to 1.0 cubic feet per second (cfs) in December 2000 and January
2001. For January is was also agreed that Cal-Am would maintain production
through the Filter Plant by operating Russell Wells Nos. 2 and 4. It was
also agreed that Cal-Am would maintain a minimum release of 10 cfs in the
channel below San Clemente Dam. During February 2001, the proposed budget
allows Cal-Am to divert up to 1.0 cfs through the Filter Plant and to operate
Scarlett No. 8, and Laureles Wells Nos. 5 and 6. During March 2001, the
proposed budget allows Cal-Am to divert up to 12 cfs, via direct diversion
from San Clemente Dam to the Carmel Valley Filter Plant, consistent with
the anticipated completion of Cal-Am's Clearwell Project. The operation
of Cal-Am Wells in the upper Carmel Valley and direct diversion of 12 cfs
during March 2000, is based on the assumption that inflows equal median
levels of 173 cfs in February and 187 cfs in March. If actual inflows are
more or less than projected for February and March, the group will reconvene
and adjust the diversion and release rates accordingly. These adjustments
will take into account flows needed for steelhead migration, spawning and
egg incubation and Cal-Am's goal of diverting a maximum of 16 cfs at San
Clemente Dam for treatment at the Carmel Valley Filter Plant.
Rule 101, Section B of the District Rules and
Regulations requires that a Public Hearing be held at the time of determination
of the District water supply management strategy. Notice of this Public
Hearing has been published in
The Herald. Adoption of the quarterly
water supply strategy and budget is categorically exempt from the California
Environmental Quality Act (CEQA) requirements as per Article 19, Section
15301 (Class 1). A Notice of Exemption will be filed with the Monterey
County Clerk's office, pending Board Action on this item.