25. MONTHLY
CAL-AM PRODUCTION REPORT
Meeting Date: February
27, 2003 Budgeted:
N/A
Program/Line Item No.: N/A
Staff Contact: Greg James Cost Estimate: N/A
General Counsel Approval: N/A
Committee Recommendation: N/A
CEQA Compliance: N/A
Total System
for Month: Total Cal-Am system production for January
was 911 acre-feet (AF), five percent less than the anticipated goal of 958 AF,
as shown on the accompanying table (Exhibit
25-A). The 911 AF of
production in January represents a 12 percent savings from Cal-Am's base year
(i.e., Water Year 1988) production of 1,036 AF.
It should be noted that beginning in July 2002, the Monthly Cal-Am Production Report uses
water year-to-date figures, in place of the Reporting Year ( July 1 through
June 30). The water year reporting
period (October 1 through September 30) is consistent with the State Water
Resources Control Board’s tracking of annual Cal-Am production, as well as
District reporting of rainfall and streamflow figures.
Total System,
Water Year to Date: Total system production for the
2003 Water Year (WY) through January 31, 2003 has been, 4,285 AF. The anticipated production of 4,434 AF for
this same period is based on an annual production goal of 15,285 AF from the
Cal-Am system. Monthly production goals are calculated by multiplying total
annual production (15,285 AF) times the average fraction of annual production
for each month (based on production data from 1988 to 1997).
Ground Water Production: During January, 38 AF were produced from Cal-Am wells in the Upper Carmel Valley. This production was 27 percent more than the anticipated production of 30 AF. Lower Carmel Valley well production was 823 AF, 39 percent more than the anticipated production of 594 AF. Cal-Am production from the coastal subareas of the Seaside Basin was six AF, 96 percent less than the 150 AF of production that was anticipated. It should be noted that in January, 29 AF were injected into the Seaside Basin as part of the Monterey Peninsula Water Management District=s ground water injection testing program in the Seaside Basin. Although this quantity is included in the 823 AF of LCV well production, it was not produced to meet customer demand.
Surface Water
Production: In January, 44 AF were diverted through the
Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, which was 76
percent less than the 184 AF of production that was anticipated. The total diversion through the CVFP for WY
2003 has been 45 AF, or one percent of total system production. Average release
to the Carmel River from San Clemente Dam during January was 175 cfs, as
measured at the Sleepy Hollow Weir.
The anticipated
river flow, storage values and production goals were developed jointly by the
District, Cal-Am, and the California Department of Fish and Game. Cal-Am and District staff are monitoring
reservoir storage, inflow and water quality, and will make additional changes
as conditions warrant. Please refer to Exhibit 25-A for additional information
regarding Cal-Am production in January 2003.