EXHIBIT 15-C
DRAFT
MONTEREY PENINSULA WATER MANAGEMENT
DISTRICT
CONDITIONS OF APPROVAL
FOR CREATION OF
FLAGG HILL WATER
DISTRIBUTION SYSTEM
APN 101-091-18/19/20
Application #20040518FLA
MPWMD Permit #M04-01
Permittee: John Jepson
Adopted by MPWMD Board of Directors on
August 16, 2004 Pursuant to Rule 22-D
1. The Flagg Hill Water Distribution
System (WDS) is authorized by the Monterey Peninsula Water Management District
(MPWMD) under Permit #M04-01 to serve Assessor’s Parcel Numbers (APN)
101-091-018, -019 and -020. The
approximately 3.3-acre service area serves three existing, contiguous
residential parcels of roughly one acre each, and is shown in Figure 1
(attached).
2. This permit authorizes the Flagg Hill WDS
to provide both potable and sub-potable water for domestic, landscaping and
irrigation use as allowed by the City of Monterey and Monterey County health
codes in the service area identified in Condition #1.
3. The
system capacity limit (“water production limit”) for the Flagg Hill WDS is
hereby set at 1.5 acre-feet per year, which may be produced from a well
located on APN 101-091-018 that extracts water from non-alluvial percolating
groundwater in the Monterey Formation. The expansion capacity limit
(“connection limit”) is set at no more than three connections for
both potable and non-potable uses in order to serve uses allowed by
Monterey City zoning regulations and permitted by County authorities on the
subject parcels. No municipal unit (jurisdiction) allocation is needed or
associated with this permit.
4. The source of water for the Flagg Hill WDS is one well (California Well Completion Report No. #761336) located on APN 101-091-018 in the approximate location shown in Figure 1.
Other
Conditions of Approval
5. Permittee shall obtain a water
distribution system permit from the Monterey County Health Department, Division
of Environmental Health, for the subject system within one year of the date of
approval of this permit. This MPWMD
permit is not considered to be valid until permit issuance from the Health
Department is completed, including certification that the raw water can be
treated to meet state quality standards in a manner acceptable to the Health
Department.
6. Permittee shall execute an
Indemnification Agreement that holds the District harmless and promises to
defend the District from any claims, demands, or expenses of any nature or kind
arising from or in any way related to the adequacy of the water supply for the
Flagg Hill WDS. This permit is not
valid until the Indemnification Agreement is signed both by Permittee and
MPWMD. The Indemnification Agreement
must be signed within 60 days of the date of approval (i.e., by Friday, October
15, 2004) for the permit to remain valid.
7. Permittee shall comply with District
rules relating to water well registration, metering and annual reporting of
production (MPWMD Rules 52 and 54).
8. The Flagg Hill WDS shall report
production by the Water Meter Method (MPWMD Rule 56) for the well designated in
Condition #4.
9. Permittee shall comply with all MPWMD
water conservation ordinances that pertain to sub-potable use. Under applicable existing ordinances, the
District requires that all new development shall install drought resistant
landscapes, and drip irrigation where appropriate.
10. No new water meter connections to the Flagg Hill WDS may be set until a water connection permit has been secured from MPWMD for each connection in accordance with MPWMD regulations governing issuance of water connection permits. Connection charges shall be calculated based on water demand estimates using the District’s water demand methodology at the time of the application.
11. Any intensification or expansion within
the Flagg Hill WDS pursuant to MPWMD Rules 23 and 24 shall require a new
application and permit.
12. Any
new facilities, expansion of service area boundaries, changed conditions
regarding water service by other entities, increase in the production or
connection limits set in Condition #3, or other changes described in MPWMD Rule
22-E shall require a permit to amend the Flagg Hill WDS.
13. No
permanent intertie between the Flagg Hill WDS and any other system shall be
allowed. The Flagg Hill WDS may receive trucked-in water in an emergency,
system failure or similar short-term critical event. Use of trucked-in water shall be guided by MPWMD Rule 173. Water derived from the main California
American Water (Cal-Am) system may only be used in a fire emergency until such
time as full compliance with State Water Resources Control Board (SWRCB)
Order WR 95-10 is achieved.
14. Nothing
in this permit shall be construed to grant or confirm any water right.
15. Upon
District approval of this permit, Permittee shall pay to the District the invoiced
cost for MPWMD staff, attorney and consultant time spent to process the permit
subsequent to the May 14, 2004 application date. The applicant is not charged for the first 35 hours of staff
time. The applicant will be provided
documentation to support the invoiced amount. This permit is not valid until
payment for the invoiced amount is received by MPWMD. Payment must be received within 60 days of the date of approval
(i.e., by Friday, October 15, 2004).
16. Upon finalization of these conditions,
the Permittee shall sign a form titled, “Acceptance of Permit Conditions for
Creation of Flagg Hill WDS.” By signing
the form, Permittee acknowledges that he/she understands and accepts these
conditions as a binding part of the permit approval, and agrees to carry them
out faithfully. This permit is not valid until the signed acceptance form has
been received by MPWMD. The signed form
must be received within 60 days of approval (by Friday, October 15, 2004).
17. Permittee shall disclose to any future owner,
successors and assigns of the property described in Condition #1 the
requirements for the Flagg Hill WDS associated with this permit. Permittee shall advise MPWMD in a timely
manner of any changes in system ownership, system name or other substantive
changes to the system to facilitate accurate record-keeping.
18. Construction tasks for facilities
authorized by this permit shall be initiated within one year from the date this
permit is issued. This permit shall
expire if no action is taken within that year. Permitted construction tasks shall be completed and water
distribution system operation shall commence within two years from the date
this permit is issued. Permittee may
apply in writing to the MPWMD General Manager for a 180-day extension to the
project initiation deadline and/or the system operation deadline, to be
approved at the discretion of the General Manager.
19. Because the Flagg Hill WDS is a multiple-parcel system, the Permittee shall submit for District review a sample Water System Agreement between the system owner /operator and recipient parcels. The Agreement should describe the rights and responsibilities of owners (current and future) of the three parcel described in Condition #1 and the system owner/operator. The sample Agreement need not be signed. The sample Agreement must be provided within 60 days of the date of approval (i.e., by Friday, October 15, 2004) for this permit to remain valid.
20. The permit granted herein is subject to
revocation in the event applicant does not fully comply with each and every
condition set forth in this Permit #M04-01.