Fees and Charges Table |
||
Action
|
Current fee or charge[1] |
Fees to be Enacted and Fees Previously Enacted |
Action on any Appeal / Variance
|
|
|
Appeal
for Site with Water Use Capacity less than one-half (0.5) af (Rule 70) |
$250 plus $70/hour for more than 10 hours |
$250 plus $70/hour for more than 10 hours |
Appeal
for Site with Water Use Capacity greater than one-half (0.5) acre foot but
not more than one (1.0) acre foot (Rule 70) |
$500 plus $70/hour for more than 10 hours |
$500 plus $70/hour for more than 10 hours |
Appeal
for Site with Water Use Capacity greater than one (1.0) af (Rule 70) |
$750 plus $70/hour for more than 10 hours |
$750 plus $70/hour for more than 10 hours |
Short-Term
Variance (Rule 91) |
$125 |
$125 |
Variance
for Site with Water Use Capacity less than one-half (0.5) af (Rule
90) |
$250 plus $70/hour for more than 10 hours |
$250 plus $70/hour for more than 10 hours |
Variance
for Site with Water Use Capacity greater than one-half (0.5) acre foot but
not more than one (1.0) acre foot (Rule 90) |
$500 plus $70/hour for more than 10 hours |
$500 plus $70/hour for more than 10 hours |
Variance
for Site with Water Use Capacity greater than one (1.0) af (Rule 90) |
$750 plus $70/hour for more than 10 hours |
$750 plus $70/hour for more than 10 hours |
Action on any Permit
|
|
|
Administrative
fee to monitor, review and enforce applications and/or permits for Special
Circumstances pursuant to Rule 24-G |
No charge |
$1400 per amendment plus
$70/hour for more than 20 hours |
Amendment
to a Commercial Connection (Expansion) Permit (Rule 20, 21) |
$125 per free-standing structure |
|
Amendment
to an Industrial Connection (Expansion) Permit (Rule 20, 21) |
$125 per free-standing structure |
$140 per amendment plus $70/hour
for more than 2 hours |
Amendment
to a Multi-Family Residential Connection (Expansion) Permit (Rule 20, 21) |
$25 per dwelling unit |
$105 per amendment plus
$70/hour for more than 1.5 hours |
Amendment
to a Public Use Connection (Expansion) Permit (Rule 20, 21) |
Permitted as commercial/industrial connection |
$140 per amendment plus
$70/hour for more than 2 hours |
Amendment
to a Single Family Residential Connection (Expansion) Permit (Rule 20, 21) |
$25 per dwelling unit |
$105 per amendment plus
$70/hour for more than 1.5 hours |
Application
for Conditional Water Permit – Connection (Expansion) to a WDS (Rule 23-D) |
$750 per application |
$350 per structure plus
$70/hour for more than 5 hours |
Application
Fee to Amend an Existing Water Distribution System (WDS) Creation Permit
(Single Parcel System) (Rule 22) |
$1400
per application plus $70/hr for more than 20 hours |
$1400 per application plus
$70/hr for more than 20 hours |
Application
Fee to Amend an Existing Water Distribution System (WDS) Creation Permit
(Multiple Parcel System) (Rule 22) |
$2450
per application plus $70/hr for more than 35 hours |
$2450 per application plus
$70/hr for more than 35 hours |
Application
Fee to Create/Establish a Water Distribution System (WDS) (Rule 22) |
$2450
per application plus $70/hr for more than 35 hours |
$2450 per application plus
$70/hr for more than 35 hours |
Application
to Create/Establish a Water Distribution System or Amend a Water Distribution
System Creation Permit – Application Consultation Deposit Fee. Required for application-related
consultation with MPWMD staff after the first hour and prior to submitting a
written application form. Unused funds
may be applied to the application fee. (Rule 22) |
$560
deposit for up to 8 hours. |
$560 deposit for up to 8
hours. |
Application to Create/Establish a Water
Distribution System or Amend a Water Distribution System Creation Permit –
Deposit for Unusually Complex Projects:
“Unusually complex projects” are
defined as projects requiring MPWMD staff time in excess of the hours stated
in the Application Fee to Create a Water Distribution System and the
Application Consultation Deposit Fee above. When the hours stated in the
Application Fee to Create a Water Distribution System and the Application
Consultation Deposit Fee are used up, the applicant must pay an additional
deposit for MPWMD staff time anticipated to complete the permit process, as
determined on a case-by-case basis by the General Manager. |
Determined
on a case-by-case basis by the General Manager |
Determined on a
case-by-case basis by the General Manager |
Application
to Create/Establish a Water Distribution System or Amend a Water Distribution
System Creation Permit – Legal Fees: Any legal work performed by MPWMD Counsel associated
with the application is charged to the applicant at actual cost, based on the
hourly rate of retained MPWMD legal counsel at the time services are rendered |
Actual cost, based on the
hourly rate of retained MPWMD legal counsel at the time services are rendered |
Actual cost, based on the hourly rate of retained
MPWMD legal counsel at the time services are rendered |
Application
to Create/Establish a Water Distribution System or Amend a Water Distribution
System Creation Permit – Unused Funds:
Unused deposits or application fee will result in a refund of unused
funds to the applicant. |
|
|
Application
to Reinstall Meter (no intensification per Rule 25.5) (Rule 60-J) |
No
Fee |
No Fee |
Application
to Split an Existing Meter (Rule 60-J) |
No
Fee |
No Fee |
Application
for Temporary Permit (Rule 23-B) |
$250-$750 depending on water
use capacity of project |
$250-$750 depending on water use capacity of project |
Application
for Water Permit – Commercial Connection (Expansion) to a WDS (Rule 20, 21) |
$250-$750 per structure depending on quantity of water[2] |
$350 per structure plus $70/hour for more than 5
hours |
Application
for Water Permit – Industrial Connection (Expansion) to a WDS (Rule 20, 21) |
$250-$750 per structure depending on quantity of water |
$350 per structure plus
$70/hour for more than 5 hours |
Application
for Water Permit – Public Use Connection (Expansion) to a WDS (Rule 20, 21) |
$250-$750 per structure depending on quantity of water |
$350 per structure plus
$70/hour for more than 5 hours |
Application
for Water Permit - Residential Connection (Expansion) to a WDS –
Multi-Family (Rule 20, 21) |
$250–500 per structure[3] |
$210 per application plus
$70/hour for more than 3 hours |
Application
for Water Permit - Residential Connection (Expansion) to a WDS - Duplex (Rule
20, 21) |
$500 per structure |
$210 per dwelling unit
plus $70/hour for more than 3 hours |
Application
for Water Permit - Residential Connection (Expansion) to a WDS – Single
Family (Rule 20, 21) |
$150 per structure |
$210 per dwelling unit
plus $70/hour for more than 3 hours |
Application
for Water Permit – Property served exclusively by a private well |
No
charge |
$105 per dwelling unit
plus $70/hour for more than 1.5 hours |
Cancellation
of Inspection (less than 8 hours notice) (Rule 24, 110, 144) |
No
charge |
$70 per inspection |
Connection Charges (Affordable
Housing) (Rule 24.5)
|
50%
of charges set pursuant to Rule 24-C and Rule 24-Table 1 |
50% of charges set
pursuant to Rule 24-C and Rule 24-Table 1 |
Connection Charges (Low Income
Housing) (Rule 24.5)
|
Exempt
from charges set pursuant to Rule 24-C and Rule 24-Table 1 |
Exempt from charges set
pursuant to Rule 24-C and Rule 24-Table 1 |
Connection Charges (Commercial)
set pursuant to Rule 24 D
|
See
Rule 24 & Rule 24 - Table II |
See Rule 24 & Rule 24
- Table II |
Connection Charges
(Governmental) set pursuant to Rule 24 D
|
See
Rule 24 & Rule 24 - Table II |
See Rule 24 & Rule 24
- Table II |
Connection Charges (Industrial)
set pursuant to Rule 24 D
|
See
Rule 24 & Rule 24 - Table II |
See Rule 24 & Rule 24
- Table II |
Connection Charges
(Residential) set pursuant to Rule 24 C
|
See
Rule 24 & Rule 24 - Table I |
See Rule 24 & Rule 24
- Table I |
Connection Charges (Temporary
Permit) set pursuant to Rule 24
|
See
Rule 24 – Minimum charge of $600. May
be credited to final permit. |
See Rule 24 – Minimum
charge of $600. May be credited to
final permit. |
Direct
Costs – Publication Expenses, Filing Fees, Etc. |
Actual cost incurred by
District-- Applies to Water Distribution System Permits only |
Actual cost incurred by District-- Applies to Water
Distribution System Permits only |
No-Show;
Failure to Provide Access for Scheduled Inspection (Rule 24, 110, 144) |
No
charge |
$70 per inspection |
Permit
Fee Payment Plans (Limited to California Non-Profit Public Benefit
Corporations and requires Board approval and finding of substantial financial
hardship) (Rule 24-N) |
Deferred
interest rate set by the Board |
Deferred interest rate set
by the Board |
Pre-Application
Consulting relating to connections to an existing Water Distribution System
(WDS) (Rule 20, 21, 23, 24) (First 30 minutes free) |
No
charge |
$210 plus $70 per hour for
more than 3 hours. |
Re-Inspection
(original inspection not in compliance) (Rule 24, 110, 144) |
No
charge |
$105 per inspection |
Refund
of Connection Charges (Rule 24-H) |
$100
processing fee |
$100 processing fee |
Fee
for fixtures added without proper water permit (does not include fees to
process required permits) – Residential (Rule 20, 21, 24) |
$50
per fixture |
$70 per fixture |
River
Works Permits (see separate list below) |
|
|
Site
Inspection (pre-application): This fee
applies to inspections requested prior to submittal of a water permit
application (Rule 24, 110, 144) |
No
charge |
$105 per inspection |
Usually Complex Applications to Amend a
Water Distribution System Creation Permit
|
$70 per hour for more than
twenty (20) hours of staff time expended to process a single-parcel
connection system or thirty-five (35) hours for a multiple-parcel connection
system |
$70 per hour for more than twenty (20) hours of staff
time expended to process a single-parcel connection system or thirty-five
(35) hours for a multiple-parcel connection system |
Water Entitlement Related Activity –
(see separate list below)
|
|
|
Water Use Credits – On Site Credits
(see separate list below)
|
|
|
Water Use Credits – Transfers (see
separate list below)
|
|
|
Compliance / Enforcement Activity
|
|
|
Recalculation
of Final Connection Fees (Rule 24B) |
$70 per hour of staff time for
all necessary efforts in excess of five hours per site |
$70 per hour of staff time for all necessary efforts
in excess of five hours per site |
Review
of fixtures added without water permit (not including additional enforcement
or required permit fees) – Residential (Rule 24) |
$50 per fixture |
$50 per fixture |
Conservation or Rationing
Activity
|
|
|
Cancellation
of Inspection (less than 8 hours notice) (Rule110) |
No
charge |
$70 per inspection |
No-Show;
Failure to Provide Access for Scheduled Inspection (Rule 110) |
No
charge |
$70 per inspection |
Re-Inspection
(original inspection not in compliance) (Rule 110) |
No
charge |
$105 per inspection |
Fee
for Expansion Surcharge - Those fees established annually, on or about July
1, by a resolution of the Board establishing the fees to be paid by new
residential, commercial/industrial users to pay for the projected costs of
the irrigation program for the four wells in lower Carmel Valley. |
As
determined by resolution of the Board |
As determined by
resolution of the Board |
Document Preparation, Processing,
Review or Retrieval
|
|
|
Deed
Preparation and Review by Staff |
No
charge |
$105 per transaction. Included in standard processing fees. |
Direct
Costs – Publication Expenses, Etc. |
Actual cost incurred by District |
Actual cost incurred by
District |
Direct
Costs for Deed Restrictions – Currier Charge, Federal Express. |
$10 per transaction |
$10 per transaction
|
Document
Recordation (if separate from review or preparation) |
$8
for first page, $3 each additional page and $2 for copy (document lengths
vary) |
$8 for first page, $3 each
additional page and $2 for copy (document lengths vary) |
Legal
Review performed by MPMWD Counsel on Deed Restrictions Related to Appeals,
Permits, Variances, Water Use Credits, or other Activities |
Actual
cost incurred by District |
Actual cost incurred by
District |
Expanded Water Conservation and Standby Rationing Plan
|
|
|
Water
Waste Notification Processing (first notice) (Rule 171) |
No charge |
No charge |
Water
Waste Fee (each flagrant occurrence) |
$50 |
$50 |
Water Waste Notification Processing
(second and subsequent occurrence) (Rule 171)
|
No charge |
No charge |
Water Waste Fee (second and
subsequent offenses within 18 months of original offense) (Rule 171)
|
$150 |
$150 |
Misrepresentation of resident survey
information during Stage 4, 5, 6 and 7 (Rule 170)
|
$250 for each offense. Each separate day or portion thereof during which any violation occurs or continues without a good-faith effort by the responsible water user to correct the violation. See Rule 170. |
$250 for each
offense. Each separate day or portion
thereof during which any violation occurs or continues without a good-faith
effort by the responsible water user to correct the violation. See Rule 170. |
Publication Fees
|
|
|
MPWMD
Rules & Regulations (Rule 61) |
$10 per copy |
$10 per copy |
Photocopies
(Rule 61) |
Ten
(10) cents per page |
Ten (10) cents per page |
Well
Registration Form (Rule 62) |
$25
per Form |
$25 per Form |
Rationing Liens
|
|
|
Deed
Preparation (Lien Release) and Review by Staff |
No
charge |
$105 per transaction |
Direct
Costs for Deed Restrictions – Currier Charge, Federal Express. |
$10
per transaction |
$10 per transaction |
Document
Recordation (if separate from review or preparation) |
$14
(Actual cost) |
$14 (Actual cost) |
Legal
Review performed by MPMWD Counsel on Deed Restrictions Related to Appeals,
Permits, Variances, Water Use Credits, or other Activities |
Actual
cost incurred by District |
Actual cost incurred by
District |
Rebate Processing
|
|
|
Application
for Rebate (Ordinance No. 110) |
No charge |
No charge |
River Works Permits
|
|
|
Minor
River Works (Rule 60) |
$25 |
$25 |
River
Works Permit (Rule 60) |
$50 |
$50 |
Emergency
River Work (Rule 60) |
$50 |
$50 |
Unusually
Complex Applications |
$70.00 per hour for MPWMD staff time in excess of five (5) hours per application, including direct costs incurred |
$70.00 per hour for MPWMD staff time in excess of
five (5) hours per application, including direct costs incurred |
Site Inspection Activities
|
|
|
Cancellation
of Inspection (less than 24hours notice) (Rule 110) |
No
charge |
$70 per inspection |
No-Show;
Failure to Provide Access for Scheduled Inspection (Rule 110) |
No
charge |
$70 per inspection |
Conservation
Verification Inspection Pursuant to Rule 143 and 144 (Retrofit of Existing
Commercial Uses and Change of Ownership or Use) |
No Charge |
No Charge |
Site
Inspection (pre-application, or not associated with a planned application)
(Rule 110) |
No
charge |
$105 per inspection |
Re-Inspection
(original inspection not in compliance) (Rule 110) |
No
charge |
$105 per inspection |
Repeat
Inspection (overlooked fixtures or failure to show all fixtures) (Rule 110) |
No
charge |
$70 per inspection |
Staff Consultation
|
|
|
Pre-Application
Consulting relating to connections to an existing Water Distribution System
(WDS) (Rule 21, 23, 24) |
No
charge |
$250 plus $70 per hour for
more than 3 hours |
Variance
|
|
|
See “Action on any Appeal /
Variance” section, above.
|
|
|
Water Entitlement Related Fees (Rule 23.5)
|
|
|
Amendment
to a Water Use Permit (Water Entitlement Process) (also may require Connection Charges pursuant to Rule 24 D) (Rule 23.5) |
|
$350 plus $70/hour for
more than 5 hours |
Application for Water Use
Permit (Water Entitlement Process) (also may require Connection Charges
pursuant to Rule 24 D) (Rule 23.5)
|
|
$210 per dwelling unit
plus $70/hour for more than 3 hours; also see Rule 24 & Rule 24
- Table I |
Water Use Permit Monitoring
(Water Entitlement Process) (Rule 23.5)
|
|
$70 plus $70/hour for more
than 1 hour |
3rd
Party Consulting or Ancillary Costs (Rule 23.5) |
|
Actual cost incurred by
District |
Legal
work performed by MPMWD Counsel on Water Entitlement Related Actions (Rule
23.5) |
|
Actual cost incurred by
District |
Direct
Costs – Currier Charge, Federal Express Charges |
|
$10 per Water Use Permit
or Amendment |
Document
Recordation (if separate from review or preparation) |
|
$8 for first page, $3 each
additional page and $2 for copy (document lengths vary) |
Water Use Credits – On Site Credit Activity
|
|
|
Extension
of a prior documented On-Site Water Use Credit (Rule 25.5) |
No
charge |
$70 plus $70 per hour for
more than 1 hour |
Site
Inspection & Documentation of fixture removal – residential (Rule 25.5) |
$250 |
$105 per application |
Site
Inspection & Documentation of qualifying devices - residential (Rule
25.5) |
$150 |
$105 per application |
Site
Inspection & Documentation of demolition – non-residential (Rule 25.5) |
$250 |
$105 per inspection |
Site
Inspection & Documentation of retrofit – non-residential (Rule 25.5) |
$1,120 for up to sixteen (16) hours of staff time |
$105 plus $70 per hour for
more than 1.5 hours |
3rd
Party Consulting or Ancillary Costs incurred to verify water use savings (Rule
25.5, 60) |
Actual
cost incurred by District |
Actual cost incurred by
District |
Unusually complex applications (Rule 25.5) |
$70
per hour (for applications that exceed 16 hours to
process) |
$70 per hour (for applications that
exceed 16 hours to process) |
|
|
|
|
|
|
|
|
|
Water Use Credits – Credit Transfer Activity
|
|
|
Application
to Transfer a Water Credit from a site (originating site) (Rule 28) |
$250 - $750 depending on amount of water transferred. $70 hour for all efforts in excess of 20 hours, plus direct costs incurred. |
$2100 plus $70 per hour
for more than 30 hours |
Application
for a Water Permit based on a Water Credit Transfer (receiving site) (Rule
20, 21, 23, 24, 25.5, 28) |
Normal
permit processing fees |
$700 plus $70 per hour for
more than 10 hours |
Complex
Transfer Surcharge for projects proposing to save water by means of new water
saving technology (Rule 25.5, 28) |
No
charge |
$2800 plus $70 per hour
for more than 40 hours (fee in addition to fees for Transfer) |
3rd
Party Consulting or Ancillary Costs incurred to review transfer (Rule 28) |
No
charge |
Actual cost incurred by
District |
Water Waste Fees
|
|
|
Fee for each flagrant
occurrence (Rule 171)
|
$50
|
$50 |
Fee for subsequent offenses
within 18 months (Rule 171)
|
$150
|
$150 |
Well Monitoring Activity
|
|
|
Registration
of an Existing Well – Non-Public Entities (Rule 62) |
$10
per Registration |
$10 per Registration |
Registration
of an Existing Well – Public Entities (Rule 62) |
No
Fee |
No Fee |
Registration
of a New Well – Non-Public Entities (Rule 62) |
$25
per Registration |
$25 per Registration |
Registration
of a New Well – Public Entities (Rule 62) |
No
Fee |
No Fee |
Well Registration Form (Rule 62) |
$25 per Form |
$25 per Form |
U:\staff\word\boardpacket\2005\2005boardpackets\20050321\PubHrgs\13\item13_attachment1.doc
[1] This column is provided for informational purposes only and will be deleted for consideration of the second reading and adoption.
[2] Separate charges based on the water use capacity of commercial, industrial and public use connections were eliminated and replaced with a time-based fee.
[3] Current charges are based on the number of apartment units, with a separate fee for ten units or less and for more than ten units. Proposed fees are time-based.