PERFORMANCE MEASURES
SUMMARY
PLANNING AND
ENGINEERING DIVISION
Program Category |
Performance Measure |
Measurement
Intent |
FY 2003-04 Performance |
FY 2004-05 Performance
* |
FY 2005-06 Target |
Environmental Protection |
Report vegetation moisture stress, soil moisture, depth to groundwater, and irrigation water use for environmental protection. |
Satisfy mitigation reporting requirements for the 1990 Water Allocation Program EIR Mitigation Program |
100% |
100% |
100% |
Environmental Protection |
Monitor stream bank stability and restore riparian corridor functions and values. |
Ensure compliance with Mitigation Program requirements; successfully protect habitat and property |
No river restoration projects funded |
Emergency work completed successfully |
100% |
Environmental Protection |
Write Mitigation Program Annual Report and distribute to agencies and the public. |
Educate agencies and the public about MPWMD compliance with 1990 Water Allocation Program EIR Mitigation and Monitoring Program; transmit information on the status of water resources and habitat. |
100% |
100% |
100% |
Water Supply |
Evaluate water augmentation alternatives as directed by the MPWMD Board. |
Carry out Board policy direction on technical and environmental review of water supply options proposed by MPWMD and others. |
100% |
100% |
100% |
Water Supply |
Obtain and protect water rights for MPWMD projects |
File permits with SWRCB; respond to other filings in accordance with SWRCB requirements |
100% |
100% |
100% |
Water Resources Management |
Participate in CPUC proceedings relating to Cal-Am |
Evaluate Cal-Am filings; prepare testimony and participate in hearings in accordance with CPUC requirements |
NA |
On target |
On Target |
Water Use and Permitting |
Evaluate applications for Water Distribution System permits in accordance with applicable laws. |
Determine whether application meets approval criteria in MPWMD Rules and Regulations and within State Permit Streamlining Act. |
100% |
100% |
100% |
* Actual performance through March 2005
U:\Andy\wp\Budget\Perform
measures 2005-06.doc