SUMMARY:
Total System
for Month: Total California American Water (Cal-Am)
system production for August was 1,476 acre-feet (AF), eight percent less than
the anticipated goal of 1,600 AF, as shown on the accompanying table (Exhibit 16-A). The 1,476 AF of production
in August represents a 20 percent savings from Cal-Am's base year (i.e., Water
Year 1988) production of 1,854 AF.
Total System,
Water Year to Date: Total system production for 2005
Water Year (WY) through August 31, 2005 has been 12,643 AF. The anticipated production of 14,046 AF for
this same period is based on an annual goal of 15,285 AF from the Cal-Am system
for customer use plus a maximum of 350 AF for injection into the
Ground Water
Production: During August, 26 AF were produced from
Cal-Am wells in the
Surface Water
Production: In August, no water was diverted through the
Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, equivalent to
the zero AF of production that was anticipated.
The total diversion through the CVFP for WY 2005 has been zero AF, or
zero percent of total system production. Average release to the
The anticipated river flow, storage values and production goals were
developed jointly by the District, Cal-Am, and the California Department of
Fish and Game in consultation with NOAA Fisheries. Cal-Am and District staff are monitoring
reservoir storage, inflow and water quality, and will make additional changes
as conditions warrant. Please refer to Exhibit 16-A for additional information
regarding Cal-Am production in August 2005.
16-A Monthly California American
Water Company Production Report
U:\staff\word\boardpacket\2005\2005boardpackets\20050919\InfoItems\16\item16.doc