2005 ANNUAL REPORT
MONTEREY PENINSULA WATER MANAGEMENT DISTRICT
EXHIBIT 3-A

 

 

 

 

 

 

Aquifer Storage and Recovery Benefits Community and Environment

 

The law requires sufficient water flow from the Carmel River to protect fish and river habitat.  However, in most years the amount of water in the River during winter and spring exceeds these requirements.  To capture this water for community use, the District began a program in 1998 of diverting a portion of excess winter and spring flows to the Seaside Groundwater Basin through California American Water’s (Cal-Am’s) water pipes.  The water is stored in the basin and later recovered and used by Cal-Am’s customers, offsetting a portion of Cal-Am’s need to pump from the Carmel River during dryer times when fish and river habitat are at greater risk.

 

The District’s project, called Aquifer Storage and Recovery (ASR) has been in operation since 1998 and approximately 1,600 acre-feet (AF) of excess winter and spring flows have been injected into the Seaside Basin.  About 1,100 AF have been recovered and delivered to the community via the Cal-Am system as part of the test program.  In 2005, District staff continued testing, with emphasis on water quality, by injecting about 350 AF into the basin.  The District is also pursuing an expansion of the Project by adding a second injection well. The expansion project envisions a maximum diversion of 2,400 AF per year from the Carmel River, and an average yield of about 1,050 AFY from the Seaside Basin.  The ASR Project is complementary to other proposed larger, long-term water augmentation projects.

 

 

                                    [Insert Photo(s) of Carmel River]

 

 

Financial Update

 

Total revenues received in FY 2004-05 were $3,935,593 while expenditures totaled $4,266,594.  The difference of $331,001 was funded from general operating reserves set aside in previous years to fund projects such as those the District is currently pursuing.  As of June 30, 2005, a balance of $2,223,274 remained in the general operating reserves account.

 

The adopted Budget for FY 2005-06 anticipates revenues of $4,464,000 and expenditures of $4,650,800 combined with the use of an additional $186,800 in general operating reserves.

 

The FY 2005-06 budget was prepared using a series of strategies developed by the staff and adopted by the Board in 2004 ending the use of general operating reserves to balance the budget.  Included in the budget was a 1.2% increase to the user fee to provide funding for expansion of the District’s ASR Project.

 

Steelhead Rescue and Rearing Season

 

During 2005 District staff rescued a total of 20,805 steelhead from drying reaches of the Carmel River.   All of the fish rescued were transported to the District’s Sleepy Hollow Steelhead Rearing Facility.  A total of 24,630 fish were brought to the Facility through September 2005, including 3,825 fish from rescues conducted by the Carmel River Steelhead Association.  Of this total, 24,457 fish were stocked in the tanks and rearing channel.  The overall survival rate of fish held at the Facility in 2005 was 57%, or 13,911 fish.  This was a favorable result compared to a summer survival rate of 10% to 40% under natural conditions. All surviving fish were in excellent physical condition.  On January 6, 2006, District Staff began releasing fish into the Carmel River at key locations best suited for their survival.  The remaining fish were released from the rearing channel on March 3, 2006, and the Facility was shut down for the remainder of the winter.

 

 

 

 

 

 

 

 

 

 

                  District staff capturing fish at Sleepy Hollow                                                   Juvenile Steelhead from Sleepy Hollow

                            Steelhead Rearing Facility                                                                                  Steelhead Rearing Facility

Year 2005 Accomplishments and Milestones

 

Water Supply

Ø      Updated a comprehensive matrix on water supply concepts that could meet community needs.  Concepts included three desalination plants, aquifer storage and recovery (ASR) in the Seaside Basin, and two types of reclaimed water projects.

Ø      Developed an Environmental Impact Report/Assessment for proposed ASR Project expansion as well as alternatives.

Ø      Obtained temporary water rights and diverted 350 AF of Carmel River water into the Seaside Basin (ASR); conducted water quality tests to quantify beneficial effect on Basin.

Ø      Participated in Monterey County led meetings of water district, city and county representatives regarding a potential governance structure for a publicly owned regional water supply project.

 

Environmental Protection

Ø      Continued efforts on Seaside Basin Groundwater Management Plan, including completion of a major technical study assessing the basin status and recommending solutions.

Ø      Determined the amount of water that can be withdrawn annually from the Seaside Basin without the risk of seawater intrusion, which was later adopted by the court during an adjudication trial.

Ø      Provided technical advice and barrier beach management on Carmel River Lagoon improvements.

Ø      Conducted emergency bank stabilization work along a portion of the Carmel River.

Ø      Maintained flow monitoring stations at 4 sites on the Carmel River and 11 sites on creeks to better assess surface water resources within the District.

Ø      Counted adult steelhead at the San Clemente Dam fish ladder to assess the winter run.

Ø      Collected surface water quality data from 3 Carmel River sites and water temperature data from 8 locations, focused on habitat conditions for rearing steelhead.

Ø      Collected groundwater level data at 70 wells and groundwater quality data at 25 wells from the District’s monitor well networks in the Carmel River and Seaside Basins.

Ø      Conducted aquatic insect sampling at 5 locations as an indicator of habitat quality for all aquatic Carmel River life.

Ø      Monitored the use of Carmel River habitat by birds at 10 locations and compared with previous year’s data to evaluate wildlife habitat along the River.

Ø      Conducted steelhead juvenile population surveys throughout the length of the Carmel River.

 

Conservation/Permitting

Ø      Approved 322 rebate applications for a total of $41,607, resulting in annual water savings of approximately 7 acre-feet (AF).*

Ø      Issued 1,351 water permits and performed 1,849 inspections resulting in annual water savings of about 29 AF.*

Ø      Provided free showerheads and moisture sensors to the public.

Ø      Actively participated in a statewide organization which provides a forum for discussion and demonstration of the latest water conservation techniques and technology.

Ø      Provided demonstrations of the latest water savings devices including ultra-low flush toilets and waterless urinals at an event sponsored by the City of Monterey that focused on energy and water conservation.  

Ø      Participated in the Water Awareness Committee of Monterey County’s Xeriscape Design Awards at the Monterey County Fair, and judged the garden displays in the horticultural center for promotion of the Water Awareness Committee’s Retire Your Turf campaign.

 

* An AF of water is enough to cover a football field with one foot of water or supply 4 Monterey Peninsula homes with water for a year

MPWMD Event Highlights Water Supply Options

 

Following the District Board’s directive to explore opportunities to collaborate on regional water supplies, the District sponsored a Town Hall Meeting on potential water supply solutions on August 25, 2005, which was attended by over 100 people.  Project proponents set up displays, made presentations and fielded questions from the audience.  The entities participating in the event included California American Water, Marina Coast Water District, Monterey County Water Resources Agency, Monterey Peninsula Water Management District, Monterey Regional Water Pollution Control Agency and Pajaro/Sunny Mesa Community Services District.

 

The above participants also worked closely with District staff to update the Comparative Matrix of Water Supply Options for a focused discussion at the September 8, 2005 Strategic Planning Workshop.  The 2005 Matrix features revised project description, cost and timeline information as well as one new project for review.  Visit the District website for more detailed information.

 

We Want To Hear From You

 

If you found the information in this report useful or have questions about water supply, conservation or other topics in this report, please contact Henrietta Stern at henri@mpwmd.dst.ca.us or at 658-5621

 

     

2005 Board of Directors                     Staff Contact Information

 

Larry Foy, Chair

Division 5

Kristi Markey, Vice-Chair

Division 3

Alvin Edwards

Division 1

Judi Lehman

Division 2

Michelle Knight

Division 4

David Pendergrass

Mayoral Representative

David Potter

Monterey County

Board of Supervisors

Representative

General Information

658-5600

 

Water Permit Office

658-5601

 

David A. Berger

General Manager/

Board Secretary

658-5650

Andrew Bell

Planning & Engineering Manager/District Engineer

658-5620

Rick Dickhaut

Administrative Services Manager/CFO/Treasurer

658-5614

David Laredo

General Counsel

658-5650

Joseph Oliver

Water Resources Manager

658-5640

Stephanie Pintar

Water Demand Manager

658-5630

Henrietta Stern

Project Manager

658-5621

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


               Monterey Peninsula

                                    Water Management District
                           5 Harris Court, Bldg. G, P.O. Box 85, Monterey, CA 93942-0085

                                    (831) 658-5600, Fax (831) 644-9560, http://www.mpwmd.dst.ca.us

 

 

                                  [District Boundary map will be added as a watermark on this page]

 

U:\staff\word\boardpacket\2006\2006boardpackets\20060417\ConsentCal\03\item3_exh3a.doc