The law requires sufficient
water flow from the
The District’s project, called
Aquifer Storage and Recovery (ASR) has been in operation since 1998 and approximately
1,600 acre-feet (AF) of excess winter and spring flows have been injected into the
[Insert Photo(s) of
Total
revenues received in FY 2004-05 were $3,935,593 while expenditures totaled
$4,266,594. The difference of $331,001
was funded from general operating reserves set aside in previous years to fund
projects such as those the District is currently pursuing. As of June 30, 2005, a balance of $2,223,274
remained in the general operating reserves account.
The
adopted Budget for FY 2005-06 anticipates revenues of $4,464,000 and
expenditures of $4,650,800 combined with the use of an additional $186,800 in
general operating reserves.
The
FY 2005-06 budget was prepared using a series of strategies developed by the
staff and adopted by the Board in 2004 ending the use of general operating
reserves to balance the budget. Included
in the budget was a 1.2% increase to the user fee to provide funding for expansion
of the District’s ASR Project.
Steelhead
Rescue and Rearing Season
During
2005 District staff rescued a total of 20,805 steelhead from drying reaches of
the
District staff capturing fish
at Sleepy Hollow Juvenile Steelhead from
Sleepy Hollow
Steelhead Rearing Facility
Steelhead Rearing Facility
Water Supply
Ø Updated a comprehensive matrix on water supply
concepts that could meet community needs.
Concepts included three desalination plants, aquifer storage and
recovery (ASR) in the
Ø
Developed an Environmental
Impact Report/Assessment for proposed ASR Project expansion as well as
alternatives.
Ø Obtained temporary water rights and diverted 350 AF of
Carmel River water into the Seaside Basin (ASR); conducted water quality tests
to quantify beneficial effect on Basin.
Ø Participated in
Environmental Protection
Ø Continued efforts on Seaside Basin Groundwater
Management Plan, including completion of a major technical study assessing the
basin status and recommending solutions.
Ø Determined the amount of water that can be withdrawn
annually from the
Ø Provided technical advice and barrier beach management
on Carmel River Lagoon improvements.
Ø Conducted emergency bank stabilization work along a portion
of the
Ø Maintained flow monitoring stations at 4 sites on the
Ø Counted adult steelhead at the San Clemente Dam fish
ladder to assess the winter run.
Ø Collected surface water quality data from 3
Ø Collected groundwater level data at 70 wells and
groundwater quality data at 25 wells from the District’s monitor well networks
in the
Ø Conducted aquatic insect sampling at 5 locations as an
indicator of habitat quality for all aquatic
Ø Monitored the use of
Ø Conducted steelhead juvenile population surveys
throughout the length of the
Conservation/Permitting
Ø Approved 322 rebate applications for a total of
$41,607, resulting in annual water savings of approximately 7 acre-feet (AF).*
Ø Issued 1,351 water permits and performed 1,849
inspections resulting in annual water savings of about 29 AF.*
Ø Provided free showerheads and moisture sensors to the
public.
Ø Actively participated in a statewide organization
which provides a forum for discussion and demonstration of the latest water
conservation techniques and technology.
Ø Provided demonstrations of the latest water savings
devices including ultra-low flush toilets and waterless urinals at an event
sponsored by the City of
Ø
Participated in
the Water Awareness Committee of Monterey County’s Xeriscape Design Awards at
the Monterey County Fair, and judged the garden displays in the horticultural
center for promotion of the Water Awareness Committee’s Retire Your Turf
campaign.
* An AF of water
is enough to cover a football field with one foot of water or supply 4
MPWMD Event Highlights
Water Supply Options
Following the District Board’s
directive to explore opportunities to collaborate on regional water supplies,
the District sponsored a Town Hall Meeting on potential water supply solutions
on August 25, 2005, which was attended by over 100 people. Project proponents set up displays, made
presentations and fielded questions from the audience. The entities participating in the event
included California American Water, Marina Coast Water District, Monterey
County Water Resources Agency, Monterey Peninsula Water Management District, Monterey
Regional Water Pollution Control Agency and Pajaro/Sunny Mesa Community
Services District.
The above participants also worked
closely with District staff to update the Comparative Matrix of Water Supply
Options for a focused discussion at the September 8, 2005 Strategic Planning
Workshop. The 2005 Matrix features
revised project description, cost and timeline information as well as one new
project for review. Visit the District website
for more detailed information.
If you found the information
in this report useful or have questions about water supply, conservation or
other topics in this report, please contact
Larry Foy, Chair |
Division 5 |
|
Division 3 |
Alvin Edwards |
Division 1 |
Judi Lehman |
Division 2 |
Michelle Knight |
Division 4 |
David Pendergrass |
Mayoral Representative |
David Potter |
Board of Supervisors Representative |
General Information |
658-5600 |
|
Water Permit Office |
658-5601 |
|
David A. Berger |
General Manager/ Board Secretary |
658-5650 |
Andrew Bell |
Planning & Engineering Manager/District Engineer |
658-5620 |
|
Administrative Services Manager/CFO/Treasurer |
658-5614 |
David Laredo |
General Counsel |
658-5650 |
Joseph Oliver |
Water Resources Manager |
658-5640 |
|
Water Demand Manager |
658-5630 |
|
Project Manager |
658-5621 |
(831) 658-5600, Fax (831) 644-9560, http://www.mpwmd.dst.ca.us
[District Boundary map will be added as a
watermark on this page]
U:\staff\word\boardpacket\2006\2006boardpackets\20060417\ConsentCal\03\item3_exh3a.doc