ITEM:

PUBLIC HEARINGS

 

17.

CONSIDER ADOPTION OF APRIL THROUGH JUNE 2007 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET

 

Meeting Date:

March 19, 2007

Budgeted: 

N/A

 

From:

David A. Berger,

Program/

N/A

 

General Manager

Line Item No.:

 

Prepared By:

Darby Fuerst

Cost Estimate:

N/A

 

General Counsel Approval:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  Notice of Exemption, CEQA, Article 19, Section 15301 (Class 1)

ESA Compliance:  Consistent with the September 2001 and June 2006 Conservation Agreements between the National Marine Fisheries Service and California American Water to minimize take of listed steelhead in the Carmel River, Consistent with SWRCB WR Order Nos. 95-10, 98-04, and 2002-0002.

 

SUMMARY: The Board will accept public comment and take action on the April through June 2007 Quarterly Water Supply Strategy and Budget for the California American Water (Cal-Am) Water Distribution System (WDS).  The proposed budget, Exhibit 17-A, is based on “critically-dry” inflow conditions for the third quarter of the Water Year 2007 (WY 2007).  Specifically, the budget utilizes monthly inflows that are based on the inflows that occurred in Water Year 1990 at the San Clemente Dam site. The proposed strategy and budget is designed to maximize the long-term production potential and protect the environmental quality of the Seaside Groundwater and Carmel River Basins.

 

Exhibit 17-A shows the anticipated production by Cal-Am for each production source.  Exhibit 17-A also shows actual production values for the water year to date.  Please note that the anticipated production values assume that Cal-Am annual system production will not exceed 14,789 acre-feet (AF), including 3,504 AF from the coastal subareas of the Seaside Groundwater Basin and 11,285 AF from the Carmel River Basin.  The total from the Carmel River Basin is consistent with SWRCB Order No. 95-10 and the total from the Seaside Groundwater Basin is consistent with the Seaside Basin adjudication decision.

 

For the first five months of Water Year 2007, Cal-Am’s production from Carmel River sources is below the SWRCB-based production target by 121 AF or 3.1 %.  In addition, for this same period, Cal-Am’s production from the coastal subareas of the Seaside Basin is 60 AF or 5.0% below the annual production target set by the court in the Seaside Basin adjudication (Case No. M66343, Monterey County Superior Court). 

 

For the purpose of this budget, it is assumed that no water from the Carmel River Basin will be diverted and injected into the Seaside Groundwater Basin during the April through June 2007 period.

 

RECOMMENDATION: The Board should receive public input, close the Public Hearing, and discuss the proposed water supply budget.  District staff recommends adoption of the proposed budget.  The budget is described in greater detail in Exhibit 17-B, Quarterly Water Supply Strategy Report: April – June 2007.

 

BACKGROUND:  The Quarterly Water Supply Strategy and Budget pertains to production within the Cal-Am main WDS for the three-month period of April, May, and June 2007.  This strategy was developed cooperatively by staff from the District, Cal-Am, and the National Marine Fisheries Service (NMFS) on March 9, 2007.  Based primarily on the assumption that “critically-dry year” inflows will occur during the April through June 2007 period and that the “low-flow” restrictions on Cal-Am’s operations in the Upper Carmel Valley (UCV) will be in effect, it was agreed that Cal-Am would produce no more than 30, 31 and 30 AF in April, May, and June, respectively, from its wells in the UCV.  In addition, it was agreed that Cal-Am would produce up to 400, 500, and 500 AF in April, May, and June, respectively, from its wells in the coastal subareas of the Seaside Basin during this period.  The projected diversions from the UCV reflect the maximum production allowed during the low-flow period.  The projected production from the coastal subareas of the Seaside Basin during the April through June 2007 period are intended to assist in maintaining flow in the Carmel River so that steelhead smolts can migrate to the ocean.

 

It was also agreed that Cal-Am would not divert any water from San Clemente Reservoir through the Carmel Valley Filter Plant during this quarter.  The remainder of the water needed to meet customer demand would be provided by Cal-Am’s wells in the Lower Carmel Valley (LCV).  Specifically, it was agreed that Cal-Am would produce approximately 710, 860, and 960 AF from its LCV wells in April, May, and June, respectively.  Cal-Am will operate its wells in the LCV in a downstream-to-upstream order.  It was agreed that, under the assumed critically-dry conditions, no water would be diverted from the Carmel River for injection into the Seaside Basin during this period.  If actual inflows are more or less than projected for the budget period, the group will reconvene and adjust the diversion and release rates accordingly.

 

Rule 101, Section B of the District Rules and Regulations requires that a Public Hearing be held at the time of determination of the District water supply management strategy.  Notice of this Public Hearing has been published in The Herald.  Adoption of the quarterly water supply strategy and budget is categorically exempt from the California Environmental Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class 1).  A Notice of Exemption will be filed with the Monterey County Clerk's office, pending Board action on this item.

 

EXHIBITS

17-A    Quarterly Water Supply Strategy and Budget: April - June 2007

17-B    Quarterly Water Supply Strategy and Budget Report: April – June 2007

Table 1

 

U:\staff\word\boardpacket\2007\2007boardpackets\20070319\PublicHrgs\17\item17.doc