SUMMARY:
Total System
for Month: Total California American Water (CAW)
system production for February was 836 acre-feet (AF), 20 percent less than the
anticipated goal of 1,050 AF, as shown on the accompanying table (Exhibit 25-A). The 836 AF of production in
February represents a 32 percent savings from Cal-Am's base year (i.e., Water
Year 1988) production of 1,238 AF.
Total System,
Water Year to Date: Total system production for
the 2007 Water Year (WY), through February 28, 2007 has been 4,988 AF.
Ground Water
Production: During February, 36 AF were produced
from CAW wells in the
Surface Water
Production: In February, no water was diverted
through the Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir,
equivalent to the zero AF of production that was anticipated. The total diversion through the CVFP for
WY 2007 has been zero AF, or zero percent of total system production. Average
release to the
The anticipated river flow, storage values and production goals were
developed jointly by the District, CAW, and the California Department of Fish
and Game in consultation with NOAA Fisheries. CAW and District staff are monitoring
reservoir storage, inflow and water quality, and will make additional changes
as conditions warrant. Please refer
to Exhibit 25-A for additional
information regarding CAW production in February 2007.