MONTHLY WATER SUPPLY STATUS
REPORT |
||||
|
|||||
Meeting
Date: |
September 17, 2007 |
Budgeted: |
N/A |
||
|
|||||
From: |
David A.
Berger, |
Program/ |
N/A |
||
|
General
Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared
by: |
Darby
Fuerst |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance:
N/A |
|||||
Exhibit 28-A shows the
water supply status for the Monterey Peninsula Water Resources System (MPWRS)
as of September 1, 2007. This system
includes the surface water resources in the
Water Supply Status: As
shown, rainfall during WY 2007 to date has totaled 11.4 inches, which is
53% of the long-term average. Runoff
during WY 2007 to date has totaled 12,420 acre-feet (AF), which is 18%
of average. Usable storage, which
includes surface and ground water, was 27,340 AF or 93% of average at
the end of August. This storage equates
to 73% of system capacity. In addition,
222 adult steelhead were counted in the fish ladder at San Clemente Dam in
WY 2007 through April 3, 2007.
Approximately 11,970 juvenile steelhead have been rescued from
drying reaches of the
Production Compliance:
Under State Water Resources Control Board (SWRCB) Order No. WR 95-10,
California American Water (CAW) is allowed to produce no more than 11,285 AF of
water from the
28-A Water Supply Status: September 1, 2007
28-B Monthly CAW Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2007