SUMMARY:
Total System
for Month: Total California American Water (CAW) system
production for October was 1,169 acre-feet (AF), 12 percent less than the
anticipated goal of 1,323 AF, as shown on the accompanying table (Exhibit 24-A). The 1,169 AF of production
in October represents a 21 percent savings from CAW's base year (i.e., Water
Year 1988) production of 1,479 AF.
Total System,
Water Year to Date: Total system production for Water
Year (WY) 2008, which began on October 1, 2007, has been 1,169 AF.
Ground Water
Production: During October, 29 AF were produced from CAW
wells in the
Surface Water
Production: In October, no water was diverted through the
Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, equivalent to
the zero AF of production that was anticipated.
The total diversion through the CVFP for WY 2008 has been zero AF, or
zero percent of total system production. Average release to the
The anticipated river flow, storage values and production goals were
developed jointly by the District, CAW, and the California Department of Fish
and Game in consultation with NOAA Fisheries.
CAW and District staff are monitoring reservoir storage, inflow and
water quality, and will make additional changes as conditions warrant. Please refer to Exhibit 24-A for additional information
regarding CAW production in October 2007.
24-A October
2007 Monthly
U:\staff\word\boardpacket\2007\2007boardpackets\20071119\InfoItems\24\item24.doc