Total System
for Month: Total California American Water (CAW) system
production for November was 1,117 acre-feet (AF), four percent more than the
anticipated goal of 1,071 AF, as shown on the accompanying table (Exhibit
26-A). The 1,117 AF of production in
November represents a five percent increase over CAW's base year (i.e., Water
Year 1988) production of 1,067 AF.
Total System,
Water Year to Date: Total system production for the
2008 Water Year (WY), through November 30, 2007 has been 2,286 AF.
Ground Water
Production: During November, 28 AF were produced from CAW
wells in the
Surface Water
Production: In November, no water was diverted through
the Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, equivalent
to the zero AF of production that was anticipated. The total diversion through the CVFP for WY
2008 has been zero AF, or zero percent of total system production. Average
release to the
The anticipated river flow, storage values and production goals were
developed jointly by the District, CAW, and the California Department of Fish
and Game in consultation with NOAA Fisheries.
CAW and District staff are monitoring reservoir storage, inflow and
water quality, and will make additional changes as conditions warrant. Please refer to Exhibit 26-A for additional information regarding
CAW production in November 2007.
26-A November
2007 Monthly
California American Water Production Report