EXHIBIT 19-D
Monterey Peninsula Water Management District
Mid-Year Budget Adjustment
Project Expenditures
2007-08 Budget
Program/ Original Amended
Acct. No. Division Description Budget Adjustment Budget
1-2-1-B P&E Evaluate Major Desalination Projects 0 16,000 16,000
2-1-2-D P&E Reprint & Mail River-Care Guide 0 2,000 2,000
2-2-1-B P&E Construct Lower Carmel River Restoration Proj. [1] 100,000 (100,000) 0
2-2-1-B P&E Preliminary Design for Lower Carmel River Rest. Proj. 0 10,000 10,000
2-5-5-A P&E Water Dist. System Permitting-Processing Assistance [6] 20,000 30,000 50,000
2-5-1-A WRD Monitor Carmel River Near Carmel (USGS) 10,500 1,900 12,400
2-7 P&E Develop Integrated Water Management Plan [2] 145,000 159,900 304,900
3-1-1 ASD Annual Report [3] 17,000 17,000 34,000
4-1-4 WDD Policy & Procedures Manual Completion 40,000 (40,000) 0
2-3-1-A WRD SH-General Operations & Maintenance 41,400 (1,000) 40,400
2-3-2-A WRD SH-Backpack Electro fisher 5,000 1,000 6,000
2-3-1-B WRD SH-Power 48,700 (10,000) 38,700
2-3-1-G WRD SH-Water chiller for 8 rearing tanks 5,100 10,000 15,100
     Subtotal Miscellaneous 432,700 96,800 529,500
1-2-1-A-1.a WRD Permitting 15,000 (15,000) 0
1-2-1-A-1.b WRD Backflush pit, site grading, etc. 75,000 (75,000) 0
1-2-1-A-1.c WRD Well construction, pump, motor, downhole FCV 286,000 214,000 500,000
1-2-1-A-1.d WRD PG&E service coordination, upgrade to 750 KVA 50,000 (50,000) 0
1-2-1-A-1.e WRD Monitor well construction 7,000 (7,000) 0
1-2-1-A-1.f WRD Engineering & construction management 50,000 0 50,000
1-2-1-A-1.g WRD Contingency (5%) 97,000 (69,000) 28,000
1-2-1-A-2.a WRD Chemical & electrical building (1,200sf) 225,000 (225,000) 0
1-2-1-A-2.b WRD Permanent piping and instrumentation 100,000 100,000 200,000
1-2-1-A-2.c WRD Electrical system 250,000 (127,000) 123,000
1-2-1-A-2.d WRD Engineering & construction management 200,000 0 200,000
1-2-1-A-2.e WRD Contingency (10%) 150,000 (98,000) 52,000
1-2-1-A-3.a WRD Access road improvements 65,000 (65,000) 0
1-2-1-A-3.b WRD Disinfection treatment system 55,000 (55,000) 0
1-2-1-A-3.c WRD Engineering & construction management 45,000 (45,000) 0
1-2-1-A-3.d WRD Contingency (20%) 33,000 (33,000) 0
     Subtotal ASR Phase 1 Project [4] 1,703,000 (550,000) 1,153,000
2-5-2-A WRD Phase 1 MMP Implementation 32,000 (25,500) 6,500
2-5-2-B WRD Phase 2 MMP Implementation 3,000 17,000 20,000
2-5-2-B-1 WRD InSitu level trolls & cable 2,200 (2,200) 0
2-5-2-D WRD Retrofit Seaside Basin wells to monitoring wells 3,000 (3,000) 0
     Subtotal Watermaster [5] 40,200 (13,700) 26,500
4-2-1-A WDD Ryan Ranch Conservation - ET Controllers 50,000 (50,000) 0
4-2-1-A WDD Advertising & Public Outreach 0 90,000 90,000
4-2-1-B WDD School Education Program 5,000 (5,000) 0
4-2-1-B WDD Water Conservation Publications & Handouts 0 4,000 4,000
4-2-1-C WDD ET Controller Promotion & Rebates 125,000 (125,000) 0
4-2-1-D WDD CIMIS Station for Monterey Peninsula 0 8,000 8,000
4-2-2-A WDD Provide Education Materials, Showerheads, Hose Nozzles, Etc. to Public 15,000 30,000 45,000
4-2-2-B WDD Restaurant, Towel & Linen Water Conservation Program 0 18,000 18,000
4-2-3-A WDD Advertising to Promote Program 50,000 (50,000) 0
4-2-3-B WDD Print Forms and Obtain Other Related Materials 8,000 (8,000) 0
4-2-3-C WDD Garden Soft Project Software 2,000 (2,000) 0
4-2-3-D WDD Irrigation Auditor Training 12,000 (12,000) 0
4-2-3-E WDD Certified Landscape Irrigation Audits 0 150,000 150,000
4-2-4-A WDD Promote Program - Advertising, Etc. 75,000 (45,000) 30,000
4-2-4-C WDD Rebate Fund 200,000 (50,000) 150,000
     Subtotal Water Conservation 542,000 (47,000) 495,000
     Net Adjustments 2,717,900 (513,900) 2,204,000
[1]  Offsetting revenues of $60,000 deducted from reimbursements
[2]  Prop 50 grant funds carried forward from FY 2006-07; offset on revenue side
[3]  2005 report not completed until FY 2007-08
[4]  Adjust to amount to be expended in FY 2007-08
[5]  Does not include $66,500 labor; total of $93,000 included as reimbursement revenue
[6]  Add same amount to project reimbursements