SUMMARY:
Total System
for Month: Total California American Water (CAW) system
production for January was 970 acre-feet (AF), three percent more than the
anticipated goal of 941 AF, as shown on the accompanying table (Exhibit 28-A).
Total System,
Water Year to Date: Total system production for the
2008 Water Year (WY) through January 31, 2008 has been 4,263 AF.
Ground Water
Production: During January, 34 AF were produced from CAW
wells in the
Surface Water
Production: In January, no water was diverted through the
Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, equivalent to
the zero AF of production that was anticipated.
The total diversion through the CVFP for WY 2008 has been zero AF, or
zero percent of total system production. Average release to the
The anticipated river flow, storage values and production goals were
developed jointly by the District, CAW, and the California Department of Fish
and Game in consultation with NOAA Fisheries.
CAW and District staff are monitoring reservoir storage, inflow and
water quality, and will make additional changes as conditions warrant. Please refer to Exhibit 28-A for additional information regarding
CAW production in January 2008.
28-A January
2008 Monthly
California American Water Production Report