ITEM: |
PUBLIC HEARINGS |
||||
|
|||||
17. |
CONSIDER ADOPTION
OF JULY THROUGH SEPTEMBER 2008 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET |
||||
|
|||||
Meeting Date: |
June 16, 2008 |
Budgeted: |
N/A |
||
|
|||||
From: |
Darby Fuerst, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
Darby Fuerst |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee
Recommendation: N/A |
|||||
CEQA Compliance: Notice
of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|||||
ESA Compliance:
Consistent with the September 2001 and June 2006 Conservation
Agreements between the National Marine Fisheries Service and California
American Water to minimize take of listed steelhead in the Carmel River and
Consistent with SWRCB WR Order Nos. 95-10, 98-04, and 2002-02. |
|||||
SUMMARY: The Board will accept public comment
and take action on the July through September 2008 Quarterly Water Supply
Strategy and Budget for the California American Water (CAW) main Water
Distribution System (WDS). The proposed
budget, which is included as Exhibit 17-A,
shows the monthly production, by source of supply, that is required to meet
projected customer demand in CAW’s main system during the July through
September 2008 period. The proposed
strategy and budget is designed to maximize the long-term production potential
and protect the environmental quality of the Seaside Groundwater and Carmel
River Basins.
Exhibit 17-A shows the anticipated production
by CAW for each production source and the actual production values for the
water year to date through the end of May 2008.
Please note that the anticipated production values assume that CAW
annual main system production will not exceed 14,789 acre-feet (AF), including
3,504 AF from the Coastal Subareas of the Seaside Groundwater Basin and 11,285
AF from the Carmel River Basin. The
total from the Carmel River Basin is consistent with State Water Resources
Control Board (SWRCB) Order No. 95-10 and the total from the Seaside
Groundwater Basin is consistent with the Seaside Basin adjudication
decision. For the purpose of this
quarterly budget, it is assumed that dry-year inflow conditions will occur and
no water from the Carmel River Basin will be injected into the Seaside
Groundwater Basin during the July through September 2008 period. Instead, 20 AF per month will be recovered
from the Seaside Basin during the July through September period. This recovered water will allow CAW to reduce
its diversions from the Carmel Valley Alluvial Aquifer by a similar amount
during these months.
RECOMMENDATION: The Board should receive public
input, close the Public Hearing, and discuss the proposed quarterly water
supply budget. District staff recommends
adoption of the proposed budget. The
budget is described in greater detail in Exhibit
17-B, Quarterly Water Supply Strategy Report: July – September
2008.
BACKGROUND:
The Quarterly Water Supply Strategy and Budget pertains to production
within CAW’s main WDS for the three-month period of July, August, and September
2008. Staff from the District, CAW,
California Department of Fish and Game (CDFG), and NMFS cooperatively developed
this strategy on June 2, 2008. Based on
the assumption that dry-year inflows will occur during the July through
September 2008 period and that the “low-flow” restrictions on CAW’s operations
in the Upper Carmel Valley (UCV) will be in effect starting in May 2008, it was
agreed that CAW would produce no more than 31, 31, and 30 AF in July, August,
and September from its wells in the UCV, respectively. In addition, it was agreed that CAW would
produce approximately 486, 486, and 470 AF in July, August, and September from
its wells in the Coastal Subareas of the Seaside Groundwater Basin during this
period, respectively, including the injected water that will be recovered.
It
was also agreed that CAW would not divert any water from San Clemente Reservoir
through the Carmel Valley Filter Plant during this quarter. The remainder of the water needed to meet
projected customer demand would be provided by CAW’s wells in the LCV. Specifically, it was agreed that CAW would
produce 1,069, 1,069, and 932 AF from its LCV wells in July, August, and
September, respectively. CAW will
operate its wells in the LCV in a downstream-to-upstream order to meet
customer. If actual inflows are more or
less than projected for the budget period, the group will reconvene and adjust
the diversion and release rates accordingly.
Rule
101, Section B of the District Rules and Regulations requires that a Public
Hearing be held at the time of determination of the District water supply
management strategy. Notice of this
Public Hearing has been published in The Herald. Adoption of the quarterly water supply
strategy and budget is categorically exempt from the California Environmental
Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class
1). A Notice of Exemption will be filed
with the Monterey County Clerk's office, pending Board action on this item.
EXHIBITS
17-A Quarterly Water Supply Strategy
and Budget: July - September 2008
17-B Quarterly Water Supply Strategy and Budget Report:
July - September 2008
U:\staff\word\boardpacket\2008\2008boardpackets\20080616\PublicHrgs\17\item17.doc