MONTHLY WATER SUPPLY STATUS
REPORT |
||||
|
|||||
Meeting
Date: |
July 21, 2008 |
Budgeted: |
N/A |
||
|
|||||
From: |
Darby
Fuerst, |
Program/ |
N/A |
||
|
General
Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared
by: |
Darby
Fuerst |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance:
N/A |
|||||
Exhibit 26-A shows the
water supply status for the Monterey Peninsula Water Resources System (MPWRS)
as of July 1, 2008. This system includes
the surface water resources in the
Water Supply Status: As
shown, rainfall during WY 2008 to date has totaled 19.6 inches, which is
93% of the long-term average. Runoff
during WY 2008 to date has totaled 48,190 acre-feet (AF), which is 71%
of average. Usable storage, which
includes surface and groundwater, was 29,160 AF or 94% of average at the
end of June. This storage equates to 78%
of system capacity. In addition, 412
adult steelhead were counted in the fish ladder at San Clemente Dam and 36,867
juvenile steelhead have been rescued from drying reaches of the
Production Compliance:
Under State Water Resources Control Board (SWRCB) Order No. WR 95-10,
California American Water (CAW) is allowed to produce 11,285 AF of water from
the
26-A Water Supply Status: July 1, 2008