SUMMARY:
Total System
for Month: Total California American Water (CAW) system
production for July was 1,436 acre-feet (AF), nine percent less than the
anticipated production of 1,586 AF, as shown on the accompanying table (Exhibit
24-A).
Total System,
Water Year to Date: Total system production for the
2008 Water Year (WY), through July 31, 2008 has been 11,256 AF.
Ground Water
Production: During July, 29 AF were produced from CAW
wells in the
Surface Water
Production: In July, no water was diverted through the
Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, equivalent to
the zero AF of production that was anticipated.
The total diversion through the CVFP for WY 2008 has been zero AF, or
zero percent of total system production. Average release to the
The anticipated river flow, storage and production values were developed
jointly by the District, CAW, and the California Department of Fish and Game in
consultation with the National Marine Fisheries Service. CAW and District staff are monitoring
reservoir storage, inflow and water quality, and will make additional changes
as conditions warrant. Please refer to Exhibit
24-A for additional information regarding
CAW production in July 2008.