SUMMARY:
Total System
for Month: Total California American Water (CAW) system
production for August was 1,405 acre-feet (AF), 11 percent less than the
anticipated production of 1,586 AF, as shown on the accompanying table (Exhibit 20-A).
Total System,
Water Year to Date: Total system production for the
2008 Water Year (WY), through August 31, 2008 has been 12,661 AF.
Ground Water
Production: During August, 27 AF were produced from CAW
wells in the
Surface Water
Production: In August, no water was diverted through the
Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, equivalent to
the zero AF of production that was anticipated.
The total diversion through the CVFP for WY 2008 has been zero AF, or
zero percent of total system production. Average release to the
The anticipated river flow, storage and production values were developed
jointly by the District, CAW, and the California Department of Fish and Game in
consultation with the National Marine Fisheries Service. CAW and District staff are monitoring
reservoir storage, inflow, and water quality, and will make additional changes
as conditions warrant. Please refer to Exhibit 20-A for additional information
regarding CAW production in August 2008.
20-A August
2008 Monthly
California American Water Production Report
U:\staff\word\boardpacket\2008\2008boardpackets\20080922\InfoItems\20\item20.doc