EXHIBIT 15-K
MPWMD Review of CEQA Comments on
Application to Provide
Prepared February 18, 2009 by MPWMD Staff
Comment Number, Author and Date |
CEQA-Related Comment |
MPWMD Assessment |
Comment 1: |
Include condition requiring
that the 90 AFY pumped by CAW for use on the SNG site be
subtracted from the SWRCB’s 11,285 AFY production
limit from the |
The SWRCB letter of
February 5, 2009 determined that the one-for-one replacement required in
Order 95-10 does not apply to MBSE so long as CAW serves the project solely
from |
Comment 2: |
If MPWMD declines to address
the |
MPWMD continued public
hearing until February 26, 2009 to allow the Water Rights Division to render
an opinion. SWRCB letter dated
February 5, 2009 was received. |
Comment 3: |
MPWMD Rule 22-B compels a
reduction in |
CAW stated in a letter dated
January 29, 2009 that it would serve MBSE solely from |
Comment 4: |
CEQA compliance is
questionable as MPWMD is relying on an Addendum that has not been approved by
the Lead Agency. |
Issue is moot. The CELP letter was written before January
20, 2009, when City of Sand City formally adopted the Addendum (with minor
corrections unrelated to water supply or hydrology) via Resolution #SC 09-06.
|
Comment 5: |
A Subsequent EIR should be
prepared by MPWMD, with focus on hydrology, water quality and water supply. |
MPWMD disagrees that a
Subsequent EIR is needed, based on assessment of criteria in CEQA Guidelines
15162(a). |
Comment 6: |
MPWMD as a Responsible
Agency must reach its own conclusions on hydrology, water quality and water
supply. |
The MPWMD WDS permit
process entails independent review of technical and environmental reports;
independent Findings and Conditions of Approval are prepared. |
Comment 7: |
Only a Revised Draft
Addendum has been provided to the Board; it should also review the original
EIR. |
The Final Addendum as
adopted by the City of Sand City was provided to the Board and placed on the
District website. The original EIR was
also made available for review. The
original EIR describes an outdated project as it relates to hydrology, water
quality and water supply. The current project description avoids environment
effects associated with the original application. The Addendum fully analyses
the current project water effects which are less severe than the original
application. |
Comment 8: |
The issuance of the Draft
Cease and Desist Order (CDO) by SWRCB in 2008 is a new circumstance that must
be considered in a Subsequent EIR. |
MPWMD disagrees. CEQA
Guidelines 15162(a)(2) calls for a Subsequent EIR only
if the changed circumstances result in new or increased severity of
environmental effects of the project.
The MPWMD permit, as conditioned, does not allow use of |
Comment 9: |
Other CAW customers may be
impacted if they must reduce their consumption to enable CAW service to the
MBSE project, due to adjudicated water rights available to the project. |
MPWMD disagrees. The Court’s Final Decision requires
cut-backs by CAW customers to achieve the natural safe yield of the basin, independent
of this MBSE application before MPWMD.
CAW use of the MBSE water rights adds 90 AFY to CAW’s allowed use in |
Comment 10: |
A Subsequent EIR should be
prepared because the source of supply changed from onsite wells to CAW inland
wells. |
MPWMD disagrees. CEQA Guidelines 15162(a)(2)
calls for a Subsequent EIR only if the changed circumstances result in new
or increased severity of environmental effects of the project. The change to inland CAW wells is
recognized as a means to reduce the potential for seawater intrusion
due to coastal pumping. |
Comment 11: |
A Subsequent EIR should be
prepared because water could be made available from the |
MPWMD disagrees. CEQA Guidelines 15162(a)(3) calls for a
Subsequent EIR only if there are now mitigation measures or alternatives
which are considerably different than those analyzed in the previous EIR, or
were previously found to be infeasible, and would in fact be feasible. Also,
these measures must substantially reduce one or more significant effects of
the project, but the project proponents decline to adopt the measure or
alternative. All of the above criteria
must be met, which is not the case for MBSE.
The hydrologic impacts associated with the current project have
already been shown to be less than significant. Project impacts on water supply are less
than significant and may be beneficial. The desalination project is sized to
serve the redevelopment needs of Sand City and desal
water is not be available to MBSE, as it is viewed as having its own source
of supply. Use of Sand City
desalinated water delivered via CAW pipelines is not substantively different than CAW directly
pumping Seaside wells because the source water for the desal
plant is not the ocean — it is beach wells extracting brackish water
from a specified aquifer of the Seaside Basin as designated in the Seaside
Basin adjudication. From a hydrologic
perspective, the two supplies (desal and well) are
very similar—the difference is the treatment method. |
Comment 12: |
A Subsequent EIR should be
prepared because the project would use greywater,
which is not permitted in |
MPWMD disagrees. Greywater
currently is allowed in |
Comment 13: League of Women Voters (J.
Brennan), 1/6/2009 |
The issuance of the CDO is
a new circumstance that must be considered in a Subsequent EIR. |
MPWMD disagrees. See Comment 8. |
Comment 14: League of Women Voters (J.
Brennan), 1/6/2009 |
The issuance of the CDO is
a new circumstance that must be considered in a Subsequent EIR. The District should delay action until a
final decision on the CDO is made by the SWRCB |
MPWMD disagrees. See Comment 8. |
Comment 15: League of Women Voters (J.
Brennan), 1/6/2009 |
The District should
consider the effects of approving the MBSE application on the pending SWRCB
decision on the CDO. |
MPWMD disagrees. See Comment 8. |
Comment 16: League of Women Voters (J.
Brennan), 1/6/2009 |
A Subsequent EIR should
include the |
MPWMD disagrees. See Comment 11. |
U:\staff\word\boardpacket\2009\20090226\PubHrgs\15\item15_exh15k.doc