Table 1                                                                              
  QUARTERLY WATER SUPPLY STRATEGY AND BUDGET: APRIL-JUNE 2009                                                                              
   Carmel River Reservoirs: Diversion and Release Schedule Assuming Dry Inflow Conditions During March through June 2009                                                                              
              (All Values in Acre-Feet, except as indicated)                                                                              
                                                                                 
    Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 WY 2009                 Acre-Feet                                  
  Los Padres Reservoir                                    
     Inflow 222 468 924 883 10,357 3,609 2,220 1,116 442       20,240                  
     Outflow                                      
            Evaporation 21 6 2 5 14 29 34 49 53       213        
            Spillage 0 0 0 1 9,788 2,965 1,591 452 0       14,797        
            Release (Fish Ladder) 333 306 372 574 555 615 595 615 389       4,354        
            Release (Outlet) 0 0 0 0 0 0 0 0 0       0        
            Release (Notch) 0 0 0 0 0 0 0 0 0       0        
     Total Storage                                  
           Beginning of Month 692 560 716 1,266 1,569 1,569 1,569 1,569 1,569                
           End of Month 560 716 1,266 1,569 1,569 1,569 1,569 1,569 1,569                
  Between  Reservoirs                                        
      Inflow 29 55 147 335 2,530 902 555 279 110       4,943        
      Outflow                                          
           Evapotranspiration 37 18 0 0 20 0 0 0 0       75          
           Private Usage 5 2 0 0 0 0 0 0 0       7          
  San Clemente Reservoir                                  
     Inflow 320 341 519 910 12,853 4,482 2,741 1,346 499       24,011        
     Outflow                                  
            Evaporation 6 3 2 2 8 8 13 18 16       76        
            Spillage 0 0 18 23 12,168 3,798 2,074 652 71       18,803        
            Diversion (Filter Plant) 0 0 0 0 0 0 0 0 0       0        
            Release (Valve) 0 0 0 0 0 0 0 0 0       0        
            Release (Six Ports) 252 278 439 824 0 0 0 0 0       1,793                                                    
            Release ( Fish Ladder) 0 0 0 0 555 615 595 615 419       2,798                                                    
            Leakage 61 59 61 61 56 61 59 61 59       541                                                    
      Total Storage                                                                              
           Beginning of Month 71 71 72 71 71 137 137 137 137                                                            
           End of Month 71 72 71 71 137 137 137 137 71                                                            
     Total Release 314 337 518 908 12,779 4,474 2,728 1,328 549       23,935                                                    
     Mean Daily Release in cfs  5.1 5.7 8.4 14.8 230.2 72.8 45.9 21.6 9.2                                                            
     Mean Daily Diversion in cfs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0                                                            
     Mean Daily Diversion in cfs (Russell Wells) 0.5 0.5 0.2 0.2 0.5 0.5 0.5 0.5 0.5                                                            
                                                                                 
  Text Box: Notes:
1.  The minimum pool requirements at Los Padres and San Clemente Reservoirs are 91 acre-feet at elevation 980 ft and 71 acre-feet at elevation 515 ft, respectively.
2.  Projected inflows for the March through June 2009  period are based on the expectation that unimpaired flows at San Clemente Dam will equal the "dry "or 75% exceedance values for reconstructed unimpaired monthly historical flows (WY 1902-2008).
3.  Projected inflow to San Clemente Reservoir is distributed 80% above Los Padres Dam and 20% between Los Padres and San Clemente Dams.
4.  Estimated evaporation is based on average monthly reservoir surface area and gross monthly evaporation rates developed by  US Army Corps of Engineers (1981).
5.  Releases and diversions are consistent with terms of the 2001 and 2006 Conservation Agreements between the NMFS and Cal-Am and with the conditions in SWRCB Order Nos. 95-10, 98-04, and 2002-0002.