ITEM: |
INFORMATION
ITEMS/STAFF REPORT |
||||
|
|||||
30. |
MONTHLY WATER SUPPLY STATUS
REPORT |
||||
|
|||||
Meeting
Date: |
April 20, 2009 |
Budgeted: |
N/A |
||
|
|||||
From: |
|
Program/ |
N/A |
||
|
General
Manager |
Line Item
No.: |
|||
|
|
|
|||
Prepared By: |
|
Cost
Estimate: |
N/A |
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance:
N/A |
|||||
Exhibit 30-A shows the
water supply status for the Monterey Peninsula Water Resources System (MPWRS)
as of April 1, 2009. This system
includes the surface water resources in the
Water Supply Status: As shown, rainfall during WY 2009 to date has totaled 17.2 inches, which is 91% of the long-term average. Runoff during WY 2009 to date has totaled 37,630 acre-feet (AF), which is 70% of average. Usable storage, which includes surface and groundwater, was 30,600 AF or 95% of average at the end of March. This storage equates to 82% of system capacity. In addition, 84 adult steelhead have been counted in the fish ladder at San Clemente Dam and no juvenile steelhead have been rescued from drying reaches of the Carmel River mainstem by District staff in WY 2009 to date.
Production Compliance: Under
State Water Resources Control Board (SWRCB) Order No. WR 95-10, California
American Water (CAW) is allowed to produce 11,285 AF of water from the
30-A Water Supply Status: April 1, 2009
30-B Monthly CAW Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2009
U:\staff\word\boardpacket\2009\20090420\InfoItems\30\item30.doc