SUMMARY:
The Carmel Foundation, a California Public Benefit Corporation, is requesting
Board approval of a variance to the District’s metering requirements to allow a
single California American Water (CAW) connection to supply domestic water to a
low-income senior housing project at
District Rule 23-A-1-i (Exhibit 21-B) requires that each water user have a separate water meter. A “user” is defined as a customer or consumer of water, and includes each residence and every non-residential enterprise that has water uses. District Rule 90, Variance, states that “the Board may, after holding a public hearing, in specific cases, grant a variance from any provision of the standards incorporated in these Rules and Regulations whenever it finds: (a) that special circumstances exist in a particular case, and (b) that practical difficulties or unnecessary hardship would result from the strict interpretation and enforcement of any such standards, and (c) that the granting of such a variance would not tend to defeat the purposes of these Rules and Regulation”.
DISCUSSION: The Carmel Foundation is requesting a variance to the District’s metering requirements for its senior housing project. Installation of individual water meters for each unit would substantially increase the project costs and would result in a loss of parking, living area, and landscaping along the front of the property. Installation of individual CAW meters for each unit would present a hardship that could jeopardize the project. The project was planned with a central hot water system; installation of individual CAW meters would require new engineering and would be cost-prohibitive.
To mitigate the effects of using a master meter (i.e., one main CAW meter for domestic water needs), the applicant has agreed to install electronically monitored in-line water meters in each unit’s hot and cold water lines, thereby not defeating the purpose of the metering regulation. The applicant has also agreed to provide meter readings to the District. In addition, the project will incorporate installation of ultra-low consumption washers, High Efficiency Toilets, and minimal drought tolerant landscaping. All of these measures will ensure that water is efficiently used for the project.
District Rule 23-A-1-i, requiring individual water meters, was adopted to encourage conservation by making each water user accountable for their consumption. Individual water meters also facilitate compliance with water use reductions during rationing periods. The Carmel Foundation has indicated its willingness to install and monitor in-line water meters for each tenant and to allow the District access to all consumption records. The proposed action to sub-meter the units supports the District’s goals.
RECOMMENDATION: Staff recommends the Board approve the
variance with the following conditions:
1. The applicant shall install two water
meters: One for exterior uses and one
for interior uses.
2. The applicant shall install and maintain electronically monitored in-line water meters in both the hot and cold water lines to each unit.
3. The applicant shall install in-line water meters for hot and cold water to measure water use in the common laundry room.
Staff
recommends the Board adopt the Findings of Approval attached as (Exhibit 21-C).
BACKGROUND: There have been seven similar situations where the District Board has granted variances to allow in-line water meters: (1) The use of one meter for each building was authorized by the Board for the Pacific Meadows senior housing complex in Carmel Valley; (2) individual in-line meters have been used at the Naval Postgraduate School for new buildings on the main campus; (3) Santa Catalina School received a variance from the separate water meter requirement for new dormitory/faculty apartments with the condition that the school install in-line meters to monitor water use; (4) the City of Monterey received a variance from the separate water meter requirement for the Osio Plaza low to moderate-income housing units; (5) South County Housing Corporation received approval of a variance to allow a single California American Water connection to supply water to 49 low-income senior housing units; (6) PRI, LLC received a variance to allow a single California American Water connection to supply water to 18 affordable housing units; (7) Design Center, LLC received approval of a variance to allow a single California American Water connection to supply water to a mixed-use (i.e. commercial and residential) project; and (8) GLC Foothill Monterey, LLC received approval of a variance to allow a single California American Water connection to supply a non-residential use project with nine tenants.
Staff was asked to inquire about CAW in-line meters after the last variance was granted to GLC Foothill Monterey, LLC. Although CAW has previously had “condo” meters, CAW no longer offers that service. Billing for the Carmel Foundation project will be made through the two house meters and will be paid by Carmel Foundation.
21-A Variance Application
21-B District Rule 23-A
21-C Findings of Approval