ITEM: |
INFORMATION
ITEMS/STAFF REPORT |
||||
|
|||||
33. |
MONTHLY WATER SUPPLY STATUS
REPORT |
||||
|
|||||
Meeting
Date: |
June 15, 2009 |
Budgeted: |
N/A |
||
|
|||||
From: |
Darby
Fuerst, |
Program/ |
N/A |
||
|
General
Manager |
Line Item
No.: |
|||
|
|
|
|||
Prepared By: |
Darby
Fuerst |
Cost
Estimate: |
N/A |
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance:
N/A |
|||||
Exhibit 33-A shows the
water supply status for the Monterey Peninsula Water Resources System (MPWRS)
as of June 1, 2009. This system includes
the surface water resources in the
Water Supply Status: As shown, rainfall during WY 2009 to date has totaled 18.1 inches, which is 86% of the long-term average. Runoff during WY 2009 to date has totaled 44,400 acre-feet (AF), which is 67% of average. Usable storage, which includes surface and groundwater, was 30,670 AF or 96% of average at the end of May. This storage equates to 81% of system capacity. In addition, 95 adult steelhead have been counted in the fish ladder at San Clemente Dam and no juvenile steelhead have been rescued from drying reaches of the Carmel River mainstem by District staff in WY 2009 to date.
Production Compliance: Under
State Water Resources Control Board (SWRCB) Order No. WR 95-10, California
American Water (CAW) is allowed to produce 11,285 AF of water from the
33-A Water Supply Status: June 1, 2009
33-B Monthly CAW Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2009
U:\staff\word\boardpacket\2009\20090615\InfoItems\33\item33.doc