SUMMARY:
Total System
for Month: Total California American Water (CAW) system
production for October was 1,092 acre-feet (AF), 19 percent less than the
anticipated production of 1,341 AF, as shown on the accompanying table (Exhibit 27-A).
Total System,
Water Year to Date: Total system production for Water
Year (WY) 2010, through October 31, 2009 has been 1,092 AF.
Groundwater Production: During October, no water was produced from
CAW wells in the
Surface Water
Production: In October, no water was diverted through the
Carmel Valley Filter Plant (CVFP) from San Clemente Reservoir, equivalent to
the zero AF of production that was anticipated.
The total diversion through the CVFP for WY 2010 has been zero AF. Average release to the
The anticipated river flow, storage and production values were developed
jointly by the District, CAW, and the California Department of Fish and Game in
consultation with the National Marine Fisheries Service. CAW and District staff are monitoring
reservoir storage, inflow and water quality, and will make additional changes
as conditions warrant. Please refer to Exhibit
27-A for additional information
regarding CAW production in October 2009.