1. Management Objectives
The
Monterey Peninsula Water Management District (District) desires to maximize the
long-term production potential and protect the environmental quality of the
2. Quarterly Water Supply Strategy: April - June 2011
On
March 8, 2011, staff from the District, CAW, the California Department of Fish
and Game (CDFG), NMFS, and the United States Fish and Wildlife Service (USFWS)
met and discussed the proposed water supply strategy and related topics for the
April - June 2011 period. Currently,
flow in the Carmel River is unregulated and Los Padres Reservoir (LPR) is
spilling. LPR is currently at 98% of
maximum effective storage capacity, i.e., 1,731 AF with the notch’s flashboard
removed vs. the 1,775 AF to be achieved at the end of this quarter when the
notch’s flashboard is back in place.
Flow in the Carmel River is continuous to the lagoon, and the lagoon
mouth is predominantly open, but is being breached intermittently by Monterey
County to prevent the lagoon from inundating nearby homes. Rainfall during Water Year 2011 to date at
San Clemente Dam in the upper watershed has totaled 15.72 inches or 100 % of
the long-term average to date at this site, and 73 % of the long-term annual
average of 21.41 inches. Further,
unimpaired runoff at San Clemente Dam for WY 2011 through February has totaled
approximately 34,432 AF or about 93 % of the long-term average to date for this
site, and 50 % of the long-term annual average of 68,900 AF, making this a
“Normal” Water Year Type, to date.
Carmel River Basin Given these
conditions, and runoff to date, it was agreed that “normal year” inflows would
be initially assumed to assess CAW’s operations during the April through June
2011 period. To meet customer demand,
CAW would operate its wells in the
Lastly, it was assumed that 281 AF of water would be diverted
from the Carmel River Basin and injected into the Seaside Groundwater Basin
during April 2011. Because of the
uncertainty in predicting future rainfall and runoff amounts, this assumption
is subject to change.
Seaside
Groundwater Basin It was also agreed that, subject to
rainfall and runoff conditions in the Carmel River, CAW would reinitiate
production at 450, 500, and 500 AF per month from their wells in the Coastal
Subareas, for April, May, and June 2011, in addition to the planned 25 AF per
month of production from the Sand City Desalination Plant, so as to achieve
maximum utilization of the native water available in the basin under the
Seaside Basin Adjudication Decision and in compliance with SWRCB Orders 95-10
and 2002-0060. It was also agreed that
only 17, 24, and 28 AF of groundwater would be budgeted from CAW’s wells in the
Laguna Seca Subarea of the Seaside Basin for customers in the Ryan Ranch,
Bishop, and Hidden Hills systems during April, May and June 2011,
respectively. It is recognized that,
based on recent historical use, CAW’s actual production from the Laguna Seca
Subarea during this period will likely exceed the proposed monthly targets,
which are based on CAW’s allocation specified in the Seaside Basin Adjudication
Decision. For example, in the April
through June 2010 period, CAW produced 26, 37, and 48 AF from the Laguna Seca
Subarea to meet customer demand in the Ryan Ranch, Bishop, and Hidden Hills
systems. In this context, the production
targets represent the maximum monthly production that should occur so that CAW
remains within its adjudicated allocation for the Laguna Seca Subarea. Under the amended Seaside Basin Adjudication
Decision, CAW is allowed to use production savings in the Coastal Subareas to
offset over-production in the Laguna Seca Subarea.