ITEM: |
CONSENT
CALENDAR |
||||
|
|||||
4. |
CONSIDER
EXPENDITURE OF BUDGETED FUNDS TO CONTRACT WITH THE |
||||
|
|||||
Meeting
Date: |
August
15, 2011 |
Budgeted: |
Yes |
||
|
|||||
From: |
Darby
Fuerst |
Program/ |
Riparian
Mitigations |
||
|
General
Manager |
Line
Item No.: |
2.1.4
|
||
|
|||||
Prepared
By: |
Thomas
Christensen |
Cost
Estimate: |
$16,900 |
||
|
|||||
General
Counsel Review: N/A |
|||||
Committee
Recommendation: The Administrative
Committee considered this item on August 8, 2011 and recommended approval. |
|||||
CEQA
Compliance: N/A |
|||||
SUMMARY: The Board will
consider authorizing staff to contract with the California Conservation Corps
(CCC), which will provide a crew of approximately 15 workers to help District
staff carry out vegetation management activities on the
RECOMMENDATION: District staff recommends that the Board
authorize the General Manager to enter into a contract with the California Conservation
Corps for assistance with vegetation management in the Carmel River at a cost
not-to-exceed $16,900.
BACKGROUND: The District plans to perform in-channel
vegetation management this fall at nine sites along the
Nine areas impacted by vegetation
encroachment in the channel bottom are proposed for selected vegetation
removal:
1. Highway One Bridge Area (reach length
approximately 200 feet): beginning approximately 100 feet downstream of
2. Rancho San Carlos Bridge Area (reach
length approximately 300 feet): beginning approximately at RM 3.9 just upstream
of
3. RV Park Area (reach length
approximately 300 feet): beginning approximately at RM 5.6 downstream of
4. Red Rock Area (reach length approximately
300 feet): beginning approximately at RM 8.2 at the upstream end of the Red
Rock Restoration Project; trees blocking the channel on a gravel bar will
be thinned. Some trees will be placed in
the flowing stream to provide large wood habitat. The rest of the branches will be chipped.
5. Scarlett Area (reach length
approximately 300 feet): a reach approximately 200 feet upstream of the
Scarlett Area (approximately RM 9.0) will be opened up. Multiple trees have
fallen across the channel and a gravel bar. These trees will be notched with
their branches trimmed.
6. Randazzo’s Bridge Area (reach length
approximately 400 feet): beginning at a private bridge known as Randazzo’s
Bridge at RM 10.1 and in a reach approximately 200 feet upstream of the bridge;
trees will be trimmed that are encroaching into the active channel.
7. West Garzas Area (reach length approximately
300 feet): beginning at approximately RM 12.3, upstream of California American
Water’s West Garzas Well multiple trees are encroaching into the active
channel. These trees will be trimmed back with some of the trunks placed in the
channel to provide large wood habitat.
8. De Dampierre Area (reach length
approximately 400 feet): two debris piles have settled on mid-stream gravel
bars upstream of the De Dampierre area (Little League Ball Fields in
9. Ward Area (reach length approximately
200 feet): beginning in a reach just upstream of the Ward’s private bridge RM
15.0; several large trees have fallen in the main channel. These trunks will be
notched (partially cut) and branches will be trimmed. The large sections of tree
trunks will be left in the flowing stream to provide large wood habitat.
A width of up to 40 feet of open channel
is desired. A total of approximately 2,700
lineal feet of stream encompassing approximately 0.62 acres in the channel
bottom may be affected by the vegetation removal.
Woody species in the center of the
channel, including sycamore, alder, cottonwood, and willow, will be cut by hand
using chainsaws, loppers, and other hand tools.
As described in MPWMD’s “Guidelines for Vegetation Management and
Removal of Deleterious Materials for the
River Riparian Corridor,” a minimum of
vegetation will be removed in order to maintain an open passage for flow and
debris.
The District has used CCC workers on many
occasions in the past when vegetation management activities have been on a
scale large enough that District staff cannot reasonably remove all the debris
and slash created from opening up the main channel.
EXHIBITS
None
U:\staff\word\boardpacket\2011\20110815\ConsentCal\04\item4.docx