ITEM: |
PUBLIC HEARING |
||||
|
|||||
19. |
CONSIDER
ADOPTION OF OCTOBER THROUGH DECEMBER 2011 QUARTERLY WATER SUPPLY STRATEGY AND
BUDGET |
||||
|
|||||
Meeting Date: |
September 19, 2011 |
Budgeted: |
N/A |
||
|
|||||
From: |
Dave J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
Kevan Urquhart |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee
Recommendation: N/A |
|||||
CEQA Compliance: Notice
of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|||||
ESA Compliance: Consistent with the September 2001 and February
2009 Conservation Agreements between the National Marine Fisheries Service
and California American Water to minimize take of listed steelhead in the
Carmel River and Consistent with SWRCB WR Order Nos. 95-10, 98-04, 2002-0002, and
2009-0060. |
|||||
SUMMARY: The Board will accept public comment and take
action on the October through December 2011 Quarterly Water Supply Strategy and
Budget for California American Water’s (Cal-Am’s) Main and Laguna Seca Subarea Water
Distribution Systems (WDS). The proposed
budget, which is included as Exhibits 19-A
and 19-B, shows monthly production by
source of supply that is required to meet projected customer demand in Cal-Am’s
Main and Laguna Seca Subarea systems, i.e.,
Ryan Ranch, Bishop, and Hidden Hills, during the October through
December 2011 period. The proposed
strategy and budget is designed to maximize the long-term production potential
and protect the environmental quality of the Seaside Groundwater and
Exhibit 19-A shows the anticipated production
by Cal-Am’s Main system for each production source and the actual production
values for the water year to date through the end of August 2011. Please note that the anticipated production
values assume that Cal-Am’s annual Main system production for Water Year (WY)
2012 will not exceed 12,977 acre-feet (AF), including 2,669 AF from the Coastal
Subareas of the Seaside Groundwater Basin, 1,117 AF from ASR Phase 1 recovery,
300 AF from the Sand City Desalination Plant, and 8,891 AF from the Carmel
River Basin. The total from the
Exhibit 19-B shows the anticipated production
by Cal-Am’s Laguna Seca Subarea systems for each production source and the
actual production values for WY 2011 to date through the end of August 2011. Please note that the anticipated production
values assume that Cal-Am’s annual Laguna Seca Subarea systems’ production will
not exceed 147 AF from the Laguna Seca Subarea of the Seaside Groundwater
Basin. This total is consistent with the
RECOMMENDATION: The Board should receive public input, close
the Public Hearing, and discuss the proposed quarterly water supply
budget. District staff recommends
adoption of the proposed budget. The
budget is described in greater detail in Exhibit 19-C, Quarterly Water Supply Strategy
Report: October –December 2011.
BACKGROUND:
The Quarterly Water Supply Strategy and Budget pertains to production
within Cal-Am’s Main and Laguna Seca Subarea systems for the three-month period
of October, November, and December 2011. Staff from the District and Cal-Am cooperatively
developed this strategy on September 8, 2011.
Staff from the California Department of Fish and Game (CDFG) and the National
Marine Fisheries Services (NMFS) were unable to attend, but were consulted by
phone for their approval. Based on
current reservoir and Carmel Valley Alluvial Aquifer storage conditions, and the
significant rainfall that has occurred to date, it was agreed that a range of “above
normal" to “normal” inflow conditions will occur, with above normal
conditions through November and normal in December 2011. Thereafter, “normal”
year inflows would be used to assess Cal-Am’s operations and set monthly
production targets for Cal-Am’s systems from January through September 2012.
To
meet customer demand in its main system, Cal-Am will produce approximately 0 AF
of groundwater from its wells in the Upper Carmel Valley during October,
November, and December 2011. Similarly,
Cal-Am will produce approximately 588, 367, and 408 AF of groundwater from its
wells in the Lower Carmel Valley during October, November, and December 2011,
respectively. The permitted diversion
season for ASR does not begin again until December 1, which is during WY 2012. Diversions to storage for ASR Phase 1 will
begin after December 1st, whenever flows in the river are legally
adequate to do so. For planning purposes
staff scheduled 140 AF of diversions to ASR storage, based on the long-term
average diversion rate predicted by the Carmel Valley Simulation Model (CVSIM)
for that month.
It
was also agreed that, subject to rainfall and runoff conditions in the Carmel
River Basin, Cal-Am would continue to produce water from the Coastal Subareas
of the Seaside Basin during this period.
Cal-Am is projected to produce 177, 178, and 178 AF of native
groundwater from the Seaside Basin in the months of October, November, and
December 2011, respectively. A
concurrent production goal is to complete the recovery of the 1,117 AF of water
stored by Water Project 1 (ASR Phase 1) in WY 2011, with 373, 372, and 372 AF to
be recovered in the months of October, November, and December 2011,
respectively. There is also a goal of producing
an additional 25 AF of treated brackish groundwater from the Sand City
Desalination Plant in each of these three months. In addition, it was also agreed that Cal-Am
should produce only 14, 10, and 8 AF of groundwater from its wells in the
Laguna Seca Subarea for its customers in the Ryan Ranch, Bishop, and Hidden
Hills systems during October, November, and December 2011, respectively. Lastly, it was agreed that Cal-Am would not
divert any water from San Clemente Reservoir through the Carmel Valley Filter
Plant during this quarter. Cal-Am will
operate its wells in the Lower Carmel Valley in a downstream-to-upstream
order. If actual natural river inflows
are less than projected for the budget period, the group will reconvene and
adjust the LPD release rates accordingly.
Rule
101, Section B of the District Rules and Regulations requires that a Public
Hearing be held at the time of determination of the District water supply
management strategy. Notice of this
Public Hearing has been published in The Herald. Adoption of the quarterly water supply
strategy and budget is categorically exempt from the California Environmental
Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class
1). A Notice of Exemption will be filed
with the Monterey County Clerk's office, pending Board action on this item.
EXHIBITS
19-A Quarterly Water Supply Strategy and
Budget for Cal-Am Main System: October –December 2011
19-B Quarterly Water Supply Strategy
and Budget for Cal-Am Subsystems: October –December 2011
19-C Quarterly Water Supply Strategy and Budget
Report: October –December 2011
U:\staff\word\boardpacket\2011\20110919\PubHrng\19\item19.doc September
13, 2011