Consider Expenditure of Budgeted Funds FOR ENVIRONMENTAL REVIEW FOR WATER PROJECT 2

 

Meeting Date:

December 12, 2011

Budgeted: 

Yes

 

From:

David J. Stoldt,

Program/

1-2-1-B

 

General Manager

Line Item No.:

3c. and 3d.

 

Prepared By:

Joe Oliver

Cost Estimate:

 

 

$29,150

reimbursable (Cal-Am)

 

 

General Counsel Review:  N/A

Committee Recommendation:  The Administrative Committee reviewed this item on December 5, 2011 and recommended approval.

CEQA Compliance:  N/A for contract; supports CEQA compliance for WP2.

 

SUMMARY:  The Monterey Peninsula Water Management District (MPWMD or District) and California American Water (Cal-Am) are jointly pursuing Phase 2 facilities of the Aquifer Storage and Recovery (ASR) program, known as “Water Project 2” (WP2) at the Seaside Middle School (SMS) site.  SMS Well #1 was drilled in 2010 under a California Environmental Quality Act (CEQA) exemption for a test project.  Full CEQA compliance is now needed for the SMS Well #1 to be deemed a permanent water supply project, along with construction of a new SMS Well #2, currently planned for summer 2012.  These two wells, along with appurtenant facilities, will comprise Water Project 2.

 

Due to easement conditions imposed by the Monterey Peninsula Unified School District, certain well construction activities may only occur when school is not in session (June through early August 2012).  To meet this timeline, assistance by consultants is needed now to prepare CEQA compliance documents in early 2012.  Based on the existing environmental review documentation and planned site-specific project components, it is intended that the CEQA document will be an Addendum to the ASR Phase 1 Environmental Impact Report completed for MPWMD in 2006.

 

Exhibit 5-A provides an overview of the WP2 project description, which was provided to Denise Duffy and Associates (DDA) in late November 2011.  Accordingly, a proposal for this work has been developed by DDA and is included as Exhibit 5-B.  DDA was selected as a sole-source consultant due to time limitations and the firm’s prior work and familiarity with the ASR operations at the Water Project 1 site. 

 

RECOMMENDATION:   District staff recommends authorization to retain DDA to prepare CEQA compliance documents for WP2.  The cost estimate for this planned work is included in the proposal from DDA and totals $26,500 (Exhibit 6-B).  If approved by the Board on December 12, 2011, staff will prepare a contract with DDA immediately for this not-to-exceed amount.  The requested funding authorization under this item also includes a 10% contingency amount ($2,650) which would only be utilized based on written request and authorization by the District.

 

IMPACT ON STAFF/RESOURCES:  Planning, design, construction and operation of the WP2 facilities are ongoing significant District commitments, as reflected in the MPWMD FY 2011-12 budget under Program 1-2-1-B.  Line Item 3c identifies $26,500 for CEQA environmental review support.  Contingency funding, if needed, could be assigned from Line Item 3d ($40,000) set aside for regulatory agency permitting, if unforeseen circumstances warrant.  Both line item sources are directly applicable to this work (account 4-7860.06).  Alternately, budgeted funds could be assigned from the overall project contingency and a mid-year budget adjustment could be made in early 2012, if needed.  District staff will continue to coordinate with Cal-Am on all work elements applicable for direct reimbursement.

 

EXHIBITS

5-A      Summary of preliminary project specifications for Water Project 2

5-B      DDA Proposal for Environmental Review Water Project 2:  Seaside Basin Aquifer Storage and Recovery Facilities at Seaside Middle School, Seaside

 

 

 

 