ITEM: |
PUBLIC HEARING |
||||
|
|||||
7. |
CONSIDER ADOPTION
OF JULY THROUGH SEPTEMBER 2012 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET |
||||
|
|||||
Meeting Date: |
June 12, 2012 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
Kevan Urquhart/ |
Cost Estimate: |
N/A |
||
|
Jonathan Lear |
|
|
||
|
|||||
General Counsel Review: N/A |
|||||
Committee
Recommendation: N/A |
|||||
CEQA Compliance: Notice
of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|||||
ESA Compliance:
Consistent with the September 2001 and February 2009 Conservation
Agreements between the National Marine Fisheries Service and California
American Water to minimize take of listed steelhead in the Carmel River and
Consistent with SWRCB WR Order Nos. 95-10, 98-04, 2002-0002,
and 2009-0060. |
|||||
SUMMARY: The Board will accept public comment and take
action on the July through September 2012 Quarterly Water Supply Strategy and
Budget for the California American Water (Cal-Am) Main and Laguna Seca Subarea Water
Distribution Systems (WDS). The proposed
budget, which will be presented at the meeting as Exhibits 7-A and 7-B,
will show monthly production by source of supply that is required to meet projected
customer demand in Cal-Am’s Main and Laguna Seca Subarea systems, i.e., Ryan Ranch, Bishop, and Hidden Hills, during
the July through September 2012 period.
The proposed strategy and budget is designed to maximize the long-term
production potential and protect the environmental quality of the Seaside
Groundwater and Carmel River Basins. The
exhibits for this item are not available in advance due to the early timing of
this month’s Board meeting.
Exhibit 7-A will show the anticipated production by Cal-Am’s Main
system for each production source and the actual production values for the Water
Year (WY) 2012 to date through the end of May 2012. The anticipated production values assume that
Cal-Am’s annual main system production will not exceed 13,009 acre-feet (AF), including
2,701 AF from Cal-Am’s wells in the Coastal Subareas
of the Seaside Groundwater Basin, 300 AF from Sand City Desalination Plant,
1,117 AF from Water Project 1 (formerly Phase 1 ASR), and 8,891 AF from the
Carmel River Basin. The total from the Carmel
River Basin is consistent with State Water Resources Control Board (SWRCB) Water
Rights Order Nos. 95-10, 98-04,
2002-0002, and 2009-0060. The
total from the Seaside Groundwater Basin is consistent with the Seaside Basin
Adjudication
Decision,
and includes 32 AF of “Carryover Credit” from WY 2011 that Cal-Am was allowed
to produce, but did not produce that year due to physical constraints within
its existing delivery system. For the
purpose of this budget, it is assumed that Dry inflow conditions, similar to
the same months in WY 1991, will occur for the last quarter of WY 2012.
Exhibit 7-B will show the anticipated production by Cal-Am’s Laguna Seca Subarea systems
for each production source and the actual production values for WY 2012 to date
through the end of May 2012. Please note
that the anticipated production values assume that Cal-Am’s annual Laguna Seca
Subarea systems’ production will not exceed 147 AF from the Laguna Seca Subarea
of the Seaside Groundwater Basin, whereas actual demand will exceed that amount. This total is consistent with the
RECOMMENDATION: The Board should receive public input, close
the Public Hearing, and discuss the proposed quarterly water supply
budget. District staff will recommend
adoption of the proposed budget. The
budget will be described in greater detail in Exhibit 7-C,
Quarterly Water Supply Strategy Report: July – September 2012.
BACKGROUND:
The Quarterly Water Supply Strategy and Budget pertains to production
within Cal-Am’s Main and Laguna Seca Subarea systems for the three-month period
of July, August, and September 2012. Staff
from the District, the California Department of Fish and Game (CDFG), Cal-Am,
and National Marine Fisheries Service (NMFS) will meet to cooperatively develop
this strategy on June 7, 2012. Based on
current reservoir and Carmel Valley Alluvial Aquifer storage conditions, and the
rainfall that has occurred to date, it was determined that “dry” year inflows
would be used to assess Cal-Am’s operations and set monthly production targets
for Cal-Am’s systems for the next quarter.
Once the parties have agreed to the water supply strategy for the coming
quarter, Exhibits 7-A, 7-B, and 7-C will be prepared, posted as quickly as possible on the
District’s web page, and provided at the Board Meeting on June 12, 2012.
The
permitted diversion season for ASR ended May 31, and does not begin again until
December 1 of this year, which is during the next WY 2013.
Recovery
of the 132 AF of ASR water diverted to storage in WY 2012 will likely be
delayed until the next Quarterly Water Supply Strategy and Budget (i.e., first
quarter of WY 2013). We
expect that Cal-Am will not divert any water from San Clemente Reservoir
through the Carmel Valley Filter Plant during this quarter, based on past
practice and their September 2001 and February 2009 Conservation Agreements with
the NMFS. Cal-Am will operate its wells
in the Lower Carmel Valley in a downstream-to-upstream order. If actual natural river inflows are less than
projected for the budget period, the group will reconvene and adjust the Los
Padres Dam release rates accordingly.
Rule
101, Section B of the District Rules and Regulations requires that a Public
Hearing be held at the time of determination of the District water supply
management strategy. Notice of this
Public Hearing has been published in The Herald. Adoption of the quarterly water supply
strategy and budget is categorically exempt from the California Environmental
Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class
1). A Notice of Exemption will be filed
with the Monterey County Clerk's office, pending Board action on this item.
PLANNED EXHIBITS – To Be Finalized on June 7, and Presented at the June 12, 2012 Board
Meeting
7-A Quarterly
Water Supply Strategy and Budget for Cal-Am Main System: July - September
2012
7-B Quarterly
Water Supply Strategy and Budget for Cal-Am Subsystems: July - September 2012
7-C Quarterly
Water Supply Strategy and Budget Report: July - September 2012
U:\staff\Boardpacket\2012\20120612\PubHrngs\07\item7.docx