ITEM: |
INFORMATION
ITEMS/STAFF REPORTS |
||||
|
|||||
23. |
MONTHLY WATER SUPPLY AND |
||||
|
|||||
Meeting Date: |
June 12, 2012 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance: N/A |
|||||
Exhibit 23-A
shows the water supply status for the Monterey Peninsula Water Resources System
(MPWRS) as of June 1, 2012. This system includes the surface water
resources in the
Water Supply Status: As shown, rainfall during May 2012 totaled 0.04 inches and brings the cumulative rainfall
total for WY 2012 to 13.87 inches,
which is 66% of the long-term
average through May. Estimated unimpaired runoff during May 2012 totaled 1,944 acre-feet
(AF) and brings the cumulative runoff total for WY 2012 to 18,647 AF, which is 28% of
the long-term average through May. Usable storage, which includes surface and
groundwater, was 30,650 AF,
or 96% of the long-term average through
May.
This storage equates to 81% of
system capacity. In addition, 470 adult steelhead were counted in the fish
ladder at San Clemente Dam for WY 2012 through May.
Production Compliance: Under State Water Resources Control Board
(SWRCB) Cease and Desist Order No. 2009-0060, California American Water (Cal-Am)
is allowed to produce no more than 10,308 AF of water from the
EXHIBITS
23-A Water Supply Status: June 1, 2012
23-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2012
23-C Monthly Cal-Am
production by source: WY 2012
U:\staff\Boardpacket\2012\20120612\InfoItems\23\item23.doc