ITEM: |
INFORMATION
ITEMS/STAFF REPORT |
||||
|
|||||
22. |
MONTHLY WATER SUPPLY AND |
||||
|
|||||
Meeting Date: |
July 16, 2012 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance: N/A |
|||||
Exhibit 22-A shows the
water supply status for the Monterey Peninsula Water Resources System (MPWRS)
as of July 1, 2012. This system includes the surface water
resources in the
Water Supply Status: As
shown, rainfall during June 2012 totaled
0.07 inches and brings
the cumulative rainfall total for WY 2012 to 13.94 inches, which is 66%
of the long-term average through June. Estimated unimpaired runoff during June 2012 totaled 856 acre-feet (AF)
and brings the cumulative runoff total for WY 2012 to 19,503 AF, which is 29% of the long-term average through June.
Usable storage, which includes surface and groundwater, was 30,430 AF, or 98% of the long-term average through June. This storage equates
to 81% of system capacity. In addition, 470 adult
steelhead were counted in the fish ladder at San Clemente Dam
for WY 2012 through June.
Production Compliance: Under
State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2009-0060,
California American Water (Cal-Am) is allowed to produce no more than 10,308 AF
of water from the
EXHIBITS
22-A Water Supply Status: July 1,
2012
22-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2012
22-C Monthly Cal-Am production by source: WY 2012
U:\staff\Boardpacket\2012\20120716\InfoItems\22\item22.docx