ITEM: |
PUBLIC HEARING |
Click
here for staff report and exhibits presented at the June 17, 2013 meeting |
|||||
|
|
||||||
22. |
CONSIDER ADOPTION
OF JULY THROUGH SEPTEMBER 2013 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET |
|
|||||
|
|
||||||
Meeting Date: |
June 17, 2013 |
Budgeted: |
N/A |
|
|||
|
|
||||||
From: |
David J. Stoldt, |
Program/ |
N/A |
|
|||
|
General Manager |
Line Item No.: |
|
||||
|
|
||||||
Prepared By: |
Kevan Urquhart/ |
Cost Estimate: |
N/A |
|
|||
|
Jonathan Lear |
|
|
|
|||
|
|
||||||
General Counsel Review: N/A |
|
||||||
Committee
Recommendation: N/A |
|
||||||
CEQA Compliance: Notice
of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|
||||||
ESA Compliance:
Consistent with the September 2001 and February 2009 Conservation
Agreements between the National Marine Fisheries Service and California American
Water to minimize take of listed steelhead in the Carmel River and Consistent
with SWRCB WR Order Nos. 95-10, 98-04, 2002-0002, and 2009-0060. |
|
||||||
SUMMARY:
The Board will accept public comment and take action on the July through
September 2013 Quarterly Water Supply Strategy and Budget for the California
American Water (Cal-Am) Main and Laguna Seca Subarea
Water Distribution Systems (WDS). The
proposed budget, which will be presented at the meeting as Exhibits 22-A
and 22-B, will show monthly production by source of supply that is
required to meet projected customer demand in Cal-Am’s
Main and Laguna Seca Subarea systems, i.e., Ryan Ranch, Bishop, and Hidden Hills, during
the July through September 2013 period.
The proposed strategy and budget is designed to maximize the long-term
production potential and protect the environmental quality of the Seaside
Groundwater and Carmel River Basins. The
exhibits for this item are not available in advance due to tight scheduling for
this month’s Board meeting.
Exhibit 22-A will show the anticipated production by Cal-Am’s Main system for each production source and the actual
production values for the Water Year (WY) 2013 to date through the end of May
2013. The anticipated production values
assume that Cal-Am’s annual main system production
will not exceed 12,856 acre-feet (AF), which includes 2,669 AF of native water
from the coastal subareas of the Seaside Groundwater Basin, 300 AF from the
Sand City Desalination Plant, 644 AF from Aquifer Storage and Recovery (ASR)
projects (i.e., 131 AF from WY 2012 injection; 295 AF from WY 2013 injection;
218 AF remaining from pre-permanent water rights injection), and 9,243 AF from
the Carmel River Basin. The 218 AF is
the remaining amount to be recovered from injection during the 10-year
injection testing period prior to issuance of permanent ASR water rights in WY
2008. The total from the Carmel River
Basin is consistent with State Water Resources Control Board (SWRCB) Water
Rights Order Nos. 95-10, 98-04,
2002-0002, and 2009-0060. In addition,
Cal-Am has a native water allocation of 147 AF from production from its
satellite systems in the Laguna Seca Subarea of the
Seaside Basin, that when combined with the 2,669 AF from the coastal subareas,
results in a total native water allocation of 2,816 AF. The combined total from the Seaside
Basin is consistent with the Seaside Basin Adjudication Decision. For the purpose of this budget, it is assumed
that “critically dry” inflow conditions will occur for the last quarter of WY
2013.
Exhibit 22-B will show the anticipated production by Cal-Am’s Laguna Seca Subarea systems
for each production source and the actual production values for WY 2013 to date
through the end of May 2013. Please note
that the anticipated production values assume that Cal-Am’s
annual Laguna Seca Subarea systems’ production will
not exceed 147 AF from the Laguna Seca Subarea of the
Seaside Groundwater Basin, whereas actual demand will exceed that amount.
RECOMMENDATION:
The Board should receive public input, close the Public Hearing, and
discuss the proposed quarterly water supply budget. District staff will recommend adoption of the
proposed budget. The budget will be
described in greater detail in Exhibit 22-C, Quarterly Water Supply
Strategy Report: July – September 2013.
BACKGROUND:
The Quarterly Water Supply Strategy and Budget pertains to production
within Cal-Am’s Main and Laguna Seca
Subarea systems for the three-month period of July, August, and September
2013. Staff from the District, the
California Department of Fish and Wildlife (CDFW), Cal-Am, and National Marine
Fisheries Service (NMFS) met to cooperatively develop this strategy on June 11,
2013. Based on current river flow,
reservoir and Carmel Valley Alluvial Aquifer storage conditions, and the
rainfall that has occurred to date, it was determined that “critically dry”
year inflows would be used to assess Cal-Am’s
operations and set monthly production targets for Cal-Am’s
systems for the next quarter. The water supply
strategy for the coming quarter, Exhibits
22-A, 22-B, and 22-C will be prepared, posted as
quickly as possible on the District’s web page, and provided at the Board
Meeting.
The
permitted diversion season for ASR ended May 31, and does not begin again until
December 1 of this year, which will be during the following water year, WY
2014.
It
is expected that Cal-Am will not divert any water from San Clemente Reservoir
through the Carmel Valley Filter Plant during this quarter, based on past
practice and their September 2001 and February 2009 Conservation Agreements
with the NMFS. Cal-Am will operate its
wells in the Lower Carmel Valley in a downstream-to-upstream order. If actual natural river inflows are less than
projected for the budget period, the group will reconvene and adjust the Los
Padres Dam release rates accordingly.
Rule
101, Section B of the District Rules and Regulations requires that a Public
Hearing be held at the time of determination of the District water supply
management strategy. Notice of this
Public Hearing has been published in The Herald. Adoption of the quarterly water supply
strategy and budget is categorically exempt from the California Environmental
Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class
1). A Notice of Exemption will be filed
with the Monterey County Clerk's office, pending Board action on this item.
PLANNED EXHIBITS – To be finalized after June 11,
and presented at the June 17, 2013 Board Meeting
22-A Quarterly
Water Supply Strategy and Budget for Cal-Am Main System: Jul - Sep 2013
22-B Quarterly
Water Supply Strategy and Budget for Cal-Am Subsystems: Jul - Sep 2013
22-C Quarterly
Water Supply Strategy and Budget Report: Jul - Sep 2013
U:\staff\Boardpacket\2013\20130617\PubHrngs\22\item22.docx