ITEM: |
INFORMATIONAL
ITEMS/STAFF REPORTS |
||||
|
|||||
32. |
RECEIVE AND CONFIRM WATER
SUPPLY FORECAST FOR PERIOD OF MAY 1, 2013 THROUGH SEPTEMBER 30, 2014 |
||||
|
|||||
Meeting
Date: |
June 17,
2013 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J.
Stoldt, |
Program/ |
N/A |
||
|
General
Manager |
Line Item
No.: |
|||
|
|||||
Prepared
By: |
Jonathan
Lear |
Cost Estimate: |
N/A |
||
|
|||||
General
Counsel Review: N/A |
|||||
Committee
Recommendation: N/A |
|||||
CEQA
Compliance: N/A |
|||||
SUMMARY: Regulation X of the Monterey Peninsula Water Management District (District) Rules and Regulations requires that a water supply summary forecast report be compiled annually to analyze the status of water supply and demand within the District. This report quantifies rainfall, runoff, and storage conditions within the District as of May 1, 2013, and forecasts the amount of water that will be available for use during the upcoming water year.
Physical Water Availability: As of May 1, 2013, usable water storage within the Monterey Peninsula Water Resource System (MPWRS) totaled 30,570 acre-feet (AF) or 81% of maximum storage capacity. A map of the MPWRS is included as Exhibit 32-A. A breakdown of total storage by reservoir and aquifer is shown in Exhibit 32-B. As shown, usable reservoir storage totals 1,650 AF and usable aquifer storage totals 28,920 AF. Note that the storage summary does not include usable storage in the Northern Inland and Laguna Seca Subareas of the Seaside Groundwater Basin. In addition, a summary of other water-supply related conditions within the MPWRS -- rainfall, runoff, and number of adult steelhead recorded at San Clemente Dam, and California American Water (Cal-Am) monthly diversions from the Carmel River and Seaside Groundwater Basins relative to limits set by the State Water Resources Control Board (SWRCB) and Court -- are shown in Exhibit 32-C and 32-D.
The amount of carryover storage that is needed to meet the projected water needs within the District for the remainder of Water Year (WY) 2013 and all of WY 2014 is shown in Exhibit 32-E. These projections include the water needs of both Cal-Am customers and non Cal-Am water users within the District who rely on water from the MPWRS. As shown, the projected water demand for the remainder of WY 2013 is 8,550 AF. Similarly, the projected demand for WY 2014 is 15,928 AF. This projection is based on the maximum annual production amount for the Cal-Am main system from the Carmel River Basin directed by the SWRCB in Order WR 2009-0060 (10,187 AF in WY 2013 and 10,066 AF in WY 2014), the maximum annual production amount for Cal-Am from the Seaside Groundwater Basin specified by the Court as a result of the Seaside Basin adjudication and amended by the Seaside Watermaster on November 30, 2011 (2,816 AF in WY 2012 and 2,816 AF in WY 2013), and the maximum production amount for non Cal-Am users in the MPWRS specified in the District’s Water Allocation Program (3,046 AF).
As shown in Exhibit 32-E, the total amount of water needed on May 1 to meet the projected water demand for the remainder of WY 2013 and all of WY 2014 is 24,478 AF. Given the current usable storage estimate of 30,570 AF, there is sufficient stored water in the MPWRS to meet the projected water needs for the remainder of WY 2013 and begin WY 2014 with a full year’s supply in reserve. This is consistent with the District drought protection goal approved by the Board in August 1993.
It should also be noted that this approach is conservative in that it is based entirely on storage and does not include any allowance for surface and subsurface inflows that are expected to occur. Therefore, based on the physical availability of water, no mandatory water demand reductions, i.e., rationing actions, are required at this time. It should be noted, however, that this analysis does not incorporate environmental considerations such as effects on riparian and aquatic resources or regulatory restrictions.
Note that all water users within the District are presently under Stage 1 Water Conservation which prohibits water waste and all non-essential uses of water.
Community Water Demand: For WY 2013, as of May 1, 2013, Cal-Am had produced 5,998 AF of water from its sources in the MPWRS to serve its customers. This amount of production is 401 AF under the year-to-date at month-end production target (6,399 acre-feet) that had been set for Cal-Am based on SWRCB Order WR 2009-0060 and the Seaside Groundwater Basin adjudication decision.
RECOMMENDATION: The Board should receive the water supply forecast for the May 1, 2013 through September 30, 2014 period. This item is for informational purposes only and no further action is required at this time.
IMPACTS ON STAFF/RESOURCES: District staff currently tracks and reports on water production and water supply conditions on a monthly basis; no additional impacts are anticipated related to this item.
EXHIBITS
32-A Map of the Monterey Peninsula Water Resources System (MPWRS)
32-B Water Storage Conditions, MPWRS
32-C MPWMD Water Supply Status -- May 1, 2013
32-D California American Water Production Distributed by Associated Water Rights: Water Year 2013
32-E Derivation of Water Rationing Triggers for the MPWRS for Water Year 2013
U:\staff\Boardpacket\2013\20130617\InfoItems\32\item32.docx