ITEM: |
PUBLIC
HEARING |
||||
|
|||||
22. |
AUTHORIZE DISTRIBUTION OF
FUNDS UNDER LOCAL WATER PROJECT FUNDING PROGRAM |
||||
|
|||||
Meeting
Date: |
September 16, 2013 |
Budgeted: |
Yes |
||
|
|||||
From: |
David J.
Stoldt |
Program/ |
Local Water Projects |
||
|
General
Manager |
Line Item No.: |
1-10-1 |
||
|
|||||
Prepared
By: |
David J.
Stoldt |
Cost
Estimate: |
Not to exceed $200,000 |
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee Recommendation: The Administrative Committee reviewed this item on September 9, 2013 and recommended approval; the Water Supply Planning Committee met on September 16, 2013 and will make a recommendation at the Board meeting. |
|||||
CEQA Compliance: N/A |
|||||
SUMMARY: At
its June meeting the District Board adopted a budget that included expenditure
of up to $200,000 of the Water Supply Charge for development expenses for local
water projects. The program requires
matching by the local project sponsor.
Each jurisdiction and other interested parties (potential Project
Sponsors) will be solicited annually to submit an application.
At its July meeting the Board authorized distribution of the grant/loan
application for FY2013-14. Applications
were due by September 1. Two applications were received. The application from
the City of Pacific Grove (Exhibit 22-A)
requests $100,000 for its Local Water Project.
The application from the Monterey Peninsula Airport District (Exhibit
22-B) requests up to $15,000 for a
phase 1 feasibility study for the Reuse of Existing Groundwater Remediation
Wells. A third application was expected from the Pebble Beach Company with
respect to developing a groundwater supply for the Del Monte Golf Course, but
preliminary feasibility studies indicated a low likelihood of success.
On September 9, 2013 the Administrative
Committee approved Local Water Project Grant/Loan disbursements for FY2013-14
as determined and recommended by the Water Supply Planning Committee at a
future meeting, so long as the amount does not exceed the approved budget, that
disbursements are ratified by the full Board, and that unused funds are carried
forward to FY2014-15.
The applications were reviewed by staff and
the Water Supply Planning Committee on September 16, 2103.
RECOMMENDATION: The
Water Supply Planning Committee will make a recommendation to the Board at its September
16, 2013 Board meeting.
DISCUSSION:
Project eligibility, requirements that staff and Water Supply Planning
Committee will consider are as follows:
Project Purpose: Direct water supply benefit includes the
development of a new water supply that may be used to offset the existing
unlawful diversions of the California American Water Company from the Carmel
River, as affected by the 2009 Cease and Desist Order imposed by the State
Water Resources Control Board (“SWRCB”), or may result in a new additional
supply of water that may serve future needs of the Monterey Peninsula.
Ancillary benefits may include, but are not
limited to, the following:
·
Water supply
reliability, conservation, and efficiency of use;
·
Water
quality improvement – river, ocean, groundwater;
·
Recycling
or reuse of wastewater consistent with SWRCB Recycled Water Policy;
·
Reduction
of non-point source pollution, or point source discharge consistent with SWRCB
Ocean Plan;
·
Reduction
of carbon-based emissions consistent with California AB32 goals;
·
Storm
Water capture and reuse consistent with California ASBS policy goals;
·
Groundwater
recharge;
·
Flood
management and protection of property; and
·
Environmental
mitigation, fisheries protection, or habitat restoration;
District Goals: Does the proposed
project provide water to meet additional District goals? District goals include the following four
goals:
·
Can the
Project provide water supply to the District for drought/rationing reserve
(i.e. water that is not supplied to a beneficial use immediately upon project
completion) and if so, how much?
·
Can the
Project provide water supply to the District for potential future reallocation
to the jurisdictions (i.e. water that is not supplied to a beneficial use
immediately upon project completion) and if so, how much?
·
Can the
project be run in a manner that would provide surplus production that could be
“banked” into the Seaside Groundwater Basin utilizing the District’s Aquifer
Storage and Recovery project?
·
Are
there multiple benefits to the region or the State as described above?
Evaluation:
Projects will be evaluated by staff and recommendations made to the
Committee based upon the following “Merit Factors.”
·
Application
contains basic information requested
·
Project
produces new water supply
·
Amount
of new supply
·
Ancillary
benefits demonstrated and determined to be of value to community
·
District
goals identified above, are met by project.
·
Feasibility
of Project has been demonstrated.
·
Project
Schedule is well defined and feasible.
·
Project
Financing is well defined and contingencies examined and identified.
·
Annual
Cost of Water is well defined and determined by the District to be consistent
with alternate water supply projects, with consideration for ancillary
benefits.
·
Project
status with respect to permits, consultants, and land appear to be consistent
with successful project completion.
EXHIBITS
22-A City of Pacific Grove Local Water Project Grant/Loan
Application
22-B MPAD Local Water Project Grant/Loan
Application
U:\staff\Boardpacket\2013\20130916\PubHrng\22\item22.docx