Exhibit 32-A shows the
water supply status for the Monterey Peninsula Water Resources System (MPWRS)
as of September 1, 2013. This system includes the surface water
resources in the
Water Supply Status: As
shown, rainfall during August 2013 totaled
0.00 inches and brings
the cumulative rainfall total for WY 2013 to 14.47 inches, which is 68%
of the long-term average through August. Estimated unimpaired runoff during August 2013 totaled 0 acre-feet (AF)
and brings the cumulative runoff total for WY 2013 to 27,303 AF, which is 40% of the long-term average through August.
Usable storage, which includes surface and groundwater, was 27,150 AF, or 93% of the long-term average through August. This storage equates
to 72% of system capacity. In addition, 249 adult
steelhead were counted in the fish ladder at San Clemente Dam
and 41,385 Juvenile fish were rescued through August.
Production Compliance: Under
State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2009-0060,
California American Water (Cal-Am) is allowed to produce no more than 10,187 AF
of water from the Carmel River in WY 2013.
In addition, under the Seaside Basin Decision, Cal-Am is allowed to
produce 2,887 AF (2,669 AF of native water and 219 AF of pre-permanent ASR
injected water) of water from the Coastal Subareas and 147 AF from the Laguna
Seca Subarea of the Seaside Basin in WY 2013. Altogether, Cal-Am is currently allowed
to produce 13,221 AF from Carmel River and Seaside Coastal sources for
customers in its main Monterey system and 147 AF from the Laguna Seca Subarea
for customers in Ryan Ranch, Hidden Hills, and Bishop Systems (not adjusted for
ASR recovery or Sand City Desalination).
For WY 2013 through August,
Cal-Am has produced 10,554 AF from
the Carmel River, Seaside Basin, Sand City Desalination, and ASR recovery, for
customer use. This water production is
1,167 AF or 10.0% less than the target specified
for Cal-Am’s production from the MPWRS for WY 2013 through August. A breakdown of Cal-Am’s production for WY 2013 through August is included as Exhibit 32-B. Cal-Am’s production
from the
EXHIBITS
32-A Water Supply Status: September
1, 2013
32-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2013
32-C Monthly Cal-Am production by source: WY 2013
U:\staff\Boardpacket\2013\20130916\InfoItems\32\item32.docx