ITEM: |
CONSENT CALENDAR |
||||
|
|||||
4. |
authorize expenditure for final wellhead completions at phase 1
ASR facility |
||||
|
|||||
Meeting Date: |
November 18, 2013 |
Budgeted: |
Yes |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
1-2-1 |
||
|
General Manager |
Line Item No.: |
A. 1. |
||
|
|||||
Prepared By: |
|
Cost Estimate: |
$8,680 |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: The Administrative Committee reviewed this
item on November 12, 2013 and recommended approval. |
|||||
CEQA Compliance: N/A |
|||||
SUMMARY:
The Board will consider authorization of funds for preparing, painting
and sealing the wellhead piping, valving, instrumentation and motor equipment
for the ASR-1 and 2 wells at the Phase 1 Santa Margarita Aquifer Storage and
Recovery (ASR) facility. This work is to
be completed to the same specifications as for all of the California American
Water (Cal-Am) wells and will be conducted by Cal-Am’s approved contractor.
While this work is being conducted, the wells should not be operated, so this
work is currently being scheduled for completion this fall before the upcoming
winter injection operating season. The
work is being conducted to synch scheduling with the same for the ASR-3 and 4
wells at the Phase 2 Seaside Middle School ASR facility as a means to reduce
costs for completing this work at both sites.
RECOMMENDATION:
District staff recommends authorization for expenditure of budgeted
funds up to $8,680, which includes a 15% contingency amount ($1,130) over the
estimated cost in the event that actual costs exceed the current estimate. Staff will proceed to procure the contractor
for this work if this item is adopted with the Consent Calendar.
BACKGROUND:
The District has been developing the Phase 1 ASR facilities over the
past decade as part of its larger efforts on the Seaside Basin ASR
program. Upgraded permanent pumping
equipment was recently installed in 2013 at the ASR-1 well to replace the
temporary equipment that had been in place, as operation of this well has
transitioned from a testing to permanent phase.
Currently both the ASR-1 and ASR-2 wells have permanent equipment
installed, thereby allowing this final painting and sealing work to be
conducted at the same time as a cost efficiency measure.
IMPACT
ON STAFF/RESOURCES: Planning, design, construction and operation
of the ASR Project facilities are ongoing significant staff commitments, as
reflected in the District’s Strategic Plan and annual budgeting. Funds for this work are available in the
MPWMD FY 2013-14 budget under Line Item 1-2-1 A (Water Project 1), adopted June
17, 2013 (Item 23), Account #5-04-7860.04.
EXHIBIT
None U:\staff\Boardpacket\2013\20131118\ConsentClndr\04\item4.docx