ITEM: |
INFORMATIONAL
ITEMS/STAFF REPORT |
||||
|
|||||
15. |
MONTHLY WATER SUPPLY AND |
||||
|
|||||
Meeting Date: |
August 18, 2014 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance: N/A |
|||||
Exhibit 15-A shows the
water supply status for the Monterey Peninsula Water Resources System (MPWRS)
as of August 1, 2014. This system includes the surface water
resources in the
Water Supply Status: As
shown, rainfall during July 2014 totaled
0.00 inches and brings
the cumulative rainfall total for WY 2014 to 10.42 inches, which is 49%
of the long-term average through July. Estimated unimpaired runoff during July 2014 totaled 0 acre-feet (AF)
and brings the cumulative runoff total for WY 2014 to 6,970 AF, which is 10% of the long-term average through July.
Usable storage, which includes surface and groundwater, was 27,500 AF, or 91% of the long-term average through July. This storage equates
to 73% of system capacity. In addition, 0 adult
steelhead were counted in the fish ladder at San Clemente Dam
through July.
Production Compliance: Under
State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2009-0060,
California American Water (Cal-Am) is allowed to produce no more than 10,066 AF
of water from the Carmel River in WY 2014.
In addition, under the Seaside Basin Decision, Cal-Am is allowed to
produce 2,669 AF of water from the Coastal Subareas and 147 AF from the Laguna
Seca Subarea of the Seaside Basin in WY 2014. Altogether, Cal-Am is currently allowed
to produce 12,735 AF from Carmel River and Seaside Coastal sources for
customers in its main Monterey system and 147 AF from the Laguna Seca Subarea
for customers in Ryan Ranch, Hidden Hills, and Bishop Systems (not adjusted for
ASR recovery or Sand City Desalination).
For WY 2014 through July,
Cal-Am has produced 9,124 AF from
the Carmel River, Seaside Basin, Sand City Desalination, and ASR recovery, for
customer use. This water production is
1,144 AF or 11.1 % less than the target specified
for Cal-Am’s production from the MPWRS for WY 2014 through July. A breakdown of Cal-Am’s production for WY 2014 through July is included as Exhibit 15-B. Cal-Am’s production
from the
EXHIBITS
15-A Water Supply Status: August 1, 2014
15-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2014
15-C Monthly Cal-Am production by source: WY 2014
U:\staff\Boardpacket\2014\20140818\InfoItems\15\item15.docx