ITEM: |
INFORMATIONAL
ITEMS/STAFF REPORTS |
||||
|
|||||
21. |
QUARTERLY CARMEL RIVER RIPARIAN CORRIDOR
MANAGEMENT PROGRAM REPORT |
||||
|
|||||
Meeting Date: |
July 20, 2015 |
Budgeted: |
N/A |
||
|
|||||
From: |
Dave Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
Thomas Christensen and |
Cost Estimate: |
N/A |
||
|
Larry Hampson |
|
|
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: N/A |
|||||
IRRIGATION
OF RIPARIAN VEGETATION: The
supplemental watering of riparian restoration plantings has resumed for the
summer season in 2015 at six Monterey Peninsula Water Management District
(District) riparian habitat restoration sites.
The following irrigation systems were in use April
through June: deDampierre, Trail and Saddle Club, Begonia, Schulte, Valley
Hills, and San Carlos at the Dow Property.
Water Use in Acre-Feet (AF)
(preliminary
values subject to revision)
April - June 2015 1.31
MONITORING OF RIPARIAN VEGETATION: During June
2015, staff recorded bi-monthly observations of canopy vigor on target willow
and cottonwood trees to provide an indication of plant water stress and
corresponding soil moisture levels. Four locations (Rancho Cañada, San Carlos,
Valley Hills, and Schulte) are monitored bi-monthly for canopy ratings based on
a scale from one to ten. This scale evaluates characteristics such as yellowing
leaves and percentages of defoliation (see scale on Exhibit 21-A). A total of 12 willows and 12 cottonwoods at
these locations provide a data set of established and planted sample trees that
are representative of trees in the Carmel River riparian corridor. Combined
with monthly readings from the District’s array of monitoring wells and pumping
records for large-capacity Carmel Valley wells in the California American Water
service area, the District’s monitoring provides insight into the status of
soil moisture through the riparian corridor.
Current
monitoring results for the 2015 monitoring season to date show that riparian
vegetation is below threshold stress levels.
At present, the river is drying back. However, there has been adequate
soil moisture for the first part of summer to sustain the riparian corridor.
The graph in Exhibit 21-A shows average canopy ratings for
willows and cottonwoods in selected restoration sites in the lower Carmel
Valley. The graph in Exhibit 21-B shows impacts to water table
elevations.
The
types of monitoring measurements made during May and June 2015 are as follows:
Monitoring Measurement
Canopy
ratings (See
Exhibit 21-A for trends.)
Groundwater
levels (monitoring wells) (See Exhibit
21-B for
trends.)
Groundwater pumping (production
wells)
OTHER
TASKS PERFORMED SINCE THE APRIL 2015 QUARTERLY REPORT:
1.
Carmel
River Vegetation Management Project Notification: On April 15, 2015, District staff notified the U.S.
Army Corps of Engineers, NOAA Fisheries, U.S. Fish and Wildlife Service,
California Department of Fish and Game (CDFG), and the Regional Water
Quality Control Board of six sites that are scheduled for vegetation management
activities this fall. A total of approximately 500 square feet of stream
encompassing approximately 0.011 acres in the channel bottom will be
affected by this year’s project. The goal of the vegetation
management activities is to reduce the risk of streambank erosion along
riverfront properties where vegetation encroachment could potentially
divert river flows into streambanks during high flow periods.
2.
Riparian
Irrigation Tune-up: District staff (Mark Bekker and Matt Lyons) have been tuning up
multiple irrigation systems along the Carmel River that are designed to offset
impacts associated with groundwater extraction. Tune-ups include replacement of
clogged emitters, leak repair, and trouble shooting well pumps and pressure
tanks.
3.
Public Outreach
and Education: On June 1, 2015,
District staff (Christensen) gave a presentation to the Carmel Foundation on
the current state of water supply planning for the Monterey Peninsula.
Highlights included discussion on the Monterey Peninsula Water Resource System,
Aquifer Storage and Recovery, elements of Pure Water Monterey, and the Monterey
Peninsula Water Supply Project.
EXHIBITS
21-A Average
Willow and Cottonwood Canopy Rating
21-B Depth to
Groundwater
U:\staff\Boardpacket\2015\20150720\InfoItems\21\item
21.docx