ITEM: |
INFORMATIONAL
ITEMS/STAFF REPORT |
||||
|
|||||
24. |
MONTHLY WATER SUPPLY AND |
||||
|
|||||
Meeting Date: |
August 17, 2015 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance: N/A |
|||||
Exhibit 24-A shows the water supply status for the Monterey
Peninsula Water Resources System (MPWRS) as of August 1, 2015. This system
includes the surface water resources in the
Water Supply Status: As
shown, rainfall through July 2015 totaled
0.09 inches and brings
the cumulative rainfall total for WY 2015 to 15.99 inches, which is 76%
of the long-term average through July. Estimated unimpaired runoff during July 2015 totaled 51 acre-feet (AF)
and brings the cumulative runoff total for WY 2015 to 22,158 AF, which is 33% of the long-term average through July.
Usable storage, which includes surface and groundwater, was 29,330 AF, or 98% of the long-term average through July. This storage equates
to 78% of system capacity. In addition, 7 adult
steelhead were counted in the fish ladder at San Clemente Dam
through July.
Production Compliance: Under
State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2009-0060,
California American Water (Cal-Am) is allowed to produce no more than 9,945 AF
of water from the Carmel River in WY 2015.
In addition, under the Seaside Basin Decision, Cal-Am is allowed to
produce 2,259AF of water from the Coastal Subareas and 48 AF from the Laguna
Seca Subarea of the Seaside Basin in WY 2015. Altogether, Cal-Am is currently allowed
to produce 12,196 AF from Carmel River and Seaside Coastal sources for
customers in its main Monterey system and 48 AF from the Laguna Seca Subarea
for customers in Ryan Ranch, Hidden Hills, and Bishop Systems (not adjusted for
ASR recovery or Sand City Desalination).
For WY 2015 through July,
Cal-Am has produced 8,120 AF from
the Carmel River, Seaside Basin, Sand City Desalination, and ASR recovery, for
customer use. This water production is
1,686 AF or 17.2 % less than the target specified
for Cal-Am’s production from the MPWRS for WY 2015 through July. A breakdown of Cal-Am’s production for WY 2015 through July is included as Exhibit 24-B. Cal-Am’s production
from the
EXHIBITS
24-A Water Supply Status: August 1, 2015
24-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: Water Year 2015
24-C Monthly Cal-Am production by source: WY 2015
U:\staff\Boardpacket\2015\20150817\InfoItems\24\Item24.docx