Receive WATER YEAR 2015 AQUIFER
STORAGE AND RECOVERY PROJECT SUMMARY OF OPERATIONS REPORT |
||||
|
|||||
Meeting
Date: |
July 18, 2016 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J.
Stoldt, |
Program/ |
1-2-1 |
||
|
General
Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
|
Cost
Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance: N/A |
|||||
SUMMARY: A draft report documenting the summary of operations for Water Year 2015 at the Monterey Peninsula Aquifer Storage and Recovery (ASR) Project sites has been prepared by the District’s technical consultant on the project, Pueblo Water Resources, Inc. The draft report can be viewed on the Monterey Peninsula Water Management District (MPWMD or District) home webpage under “Water Supply” at http://www.mpwmd.net/water-supply/aquifer-storage-recovery/technical-aspects/. The report documents the ASR activities conducted cooperatively with California American Water (CAW) at the Phase 1 and 2 ASR sites during WY 2015, including: (a) summary of project status and injection well performance, (b) seasonal recharge operations, and (c) water-quality monitoring. During WY 2015, which was the fourth consecutive hydrologic “dry or critically dry year”, injection operations were commensurately reduced from earlier years. A total volume of 215.2 acre-feet (AF) of Carmel River Basin source water was injected and stored in the Seaside Basin during the winter high-flow season. This contrasts with the over 1,100 AF that were injected during each of the WY 2010 and 2011 recharge seasons. The completion of this annual report is a requirement of the Central Coast Regional Water Quality Control Board (RWQCB) as part of their ongoing oversight of the ASR program in the Seaside Basin.
RECOMMENDATION: The Board should receive the draft report documenting ASR activities at the ASR project sites during WY 2015. If this item is adopted along with the Consent Calendar, the report will be finalized and distributed, subject to inclusion of comments from the District, Cal-Am or other interested parties.
BACKGROUND: The District has been pursuing Aquifer
Storage and Recovery (ASR) in the
Also in 2008, the District began negotiations with the Monterey Peninsula Unified School District (MPUSD) for potential use of an unused portion of the Seaside Middle School property for a second phase of ASR expansion. This was followed by successful exploration work at the site in 2009 and an easement for the site was acquired by Cal-Am in 2011. The District has been working under contract with Cal-Am to complete construction of permanent ASR facilities at this Phase 2 ASR site.
The draft WY 2015 report has been provided to Cal-Am staff for their review and comment. The report, once finalized, will be posted and available on the District’s website. The report will also be a useful reference document to support future operations and testing at the ASR Project sites.