ITEM: |
PUBLIC HEARING |
||||
|
|||||
28. |
CONSIDER ADOPTION
OF JULY THROUGH SEPTEMBER 2017 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET |
||||
|
|||||
Meeting Date: |
June 19, 2017 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
Kevan Urquhart & |
Cost Estimate: |
N/A |
||
|
Jonathan Lear |
|
|
||
|
|||||
General Counsel Review: N/A |
|||||
Committee
Recommendation: N/A |
|||||
CEQA
Compliance: Notice of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|||||
ESA Compliance:
Consistent with the 2001 Conservation Agreement, 2009 Settlement
Agreement between the National Marine Fisheries Service and California
American Water to minimize take of listed steelhead in the Carmel River, and SWRCB
WR Order Nos. 95-10, 98-04, 2002-0002, and 2016-0016. |
|||||
SUMMARY: The Board will accept public comment and take
action on the July through September 2017 Quarterly Water Supply Strategy and
Budget for California American Water’s (Cal-Am) Main and Laguna Seca Subarea Water
Distribution Systems (WDS). The proposed
budgets, which are included as Exhibit 28-A
and 28-B, show monthly production by source
of supply that is required to meet projected customer demand in CalAm’s Main and
Laguna Seca Subarea systems, i.e., Ryan
Ranch, Bishop, and Hidden Hills, during the July through September 2017
period. The proposed strategy and budgets
are designed to maximize the long-term production potential and protect the
environmental quality of the Seaside Groundwater and Carmel River Basins.
Exhibit
28-A
shows the anticipated production by Cal-Am’s Main system for each production
source and the actual production values for the Water Year (WY) 2017 to date
through the end of May 2017. The
anticipated production values assume that Cal-Am’s annual main system
production for customer service will not exceed 10,561 acre-feet (AF) in WY
2017, including 2,251 AF from Cal-Am’s wells in the Coastal Subareas of the
Seaside Groundwater Basin, up to 265 AF from Sand City Desalination Plant, up
to 1,200 AF recovered from what has been stored so far in WY 2017 by Phase 1 &
2 Aquifer Storage and Recovery (ASR), 305 AF recovered last fall from ASR water
injected and stored in the prior WY 2016, and approximately 6,540 AF from the
Carmel River Basin. The total from the
Carmel River Basin is consistent with State Water Resources Control Board
(SWRCB) Order No. 95-10 and 2016-0016. The
total from the Seaside Groundwater Basin is consistent with the Seaside Basin Adjudication
Decision.
Exhibit
28-B
shows the anticipated production by Cal-Am’s Laguna Seca Subarea system for
each production source and the actual production values for WY 2017 to date through
the end of May 2017. Please note that
the budgeted production values assume that Cal-Am’s annual production
for
WY 2017 will not exceed 48 AF from the Laguna Seca Subarea of the Seaside
Groundwater Basin, whereas actual demand will exceed that amount. This total is consistent with the Seaside
Basin adjudication decision.
RECOMMENDATION: The Board should receive public input, close
the Public Hearing, and discuss the proposed quarterly water supply
budget. District staff recommends
adoption of the proposed budget. The
budgets are described in greater detail in Exhibit 28-C, Quarterly Water Supply Strategy Report: July
– September 2017.
BACKGROUND:
The Quarterly Water Supply Strategy and Budget pertains to production
within Cal-Am’s Main and Laguna Seca Subarea systems for the three-month period
of July, August, and September 2017.
Staff from the District, California Department of Fish and Wildlife
(CDFW), the National Marine Fisheries Service (NMFS), and Cal-Am met to
cooperatively review, refine and approve this strategy on June 08, 2017. Staff from the State Water Resources Control
Board’s, Division of Water Rights (SWRCB-DWR) also attended by phone. Staff
from the United States Fish and Wildlife Service (USFWS) were unable to attend.
To
meet customer demand in its main system, Cal-Am intends to try to avoid producing
any groundwater from its wells in the Upper Carmel Valley during July through September
2017, and will focus instead on producing approximately 905, 913, and 815 AF of
groundwater from its wells in the Lower Carmel Valley during July, August, and September
2017, respectively.
It
was also agreed that, subject to rainfall and runoff conditions in the Carmel
River Basin, Cal-Am would produce 190, 190, and 200 AF of native groundwater each
month in July, August, and September 2017, respectively, from the Coastal
Subareas of the Seaside Basin, in addition to 25 AF per month from the Sand
City Desalination Plant, and 300 AF per month of stored water from Phase 1 &
2 ASR, during this period. It was also agreed
that Cal-Am would budget to produce 5 AF of groundwater each month from its
wells in the Laguna Seca Subarea for its customers in the Ryan Ranch, Bishop,
and Hidden Hills systems during this period. Cal-Am will operate its wells in the Lower
Carmel Valley in a downstream-to-upstream order. If actual inflows are more or
less than projected for the budget period, the group will reconvene and adjust
the diversion and release rates accordingly.
Rule
101, Section B of the District Rules and Regulations requires that a Public
Hearing be held at the time of determination of the District water supply
management strategy. Adoption of the
quarterly water supply strategy and budget is categorically exempt from the California
Environmental Quality Act (CEQA) requirements as per Article 19, Section 15301
(Class 1). A Notice of Exemption will be
filed with the Monterey County Clerk's office, pending Board action on this
item.
EXHIBITS
28-A Quarterly Water Supply Strategy and
Budget for CAW Main System: July - September 2017
28-B Quarterly Water Supply Strategy and
Budget for CAW Laguna Seca Subarea: July - September 2017
28-C Quarterly Water Supply Strategy and Budget
Report: July - September 2017
file:///U:\staff\Boardpacket\2017\20170619\PubHrngs\28\Item-28.docx