MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION
REPORT |
||||
|
|||||
Meeting Date: |
November 20, 2017 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|
||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection
of Natural Resources. |
|||||
Exhibit 24-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of November 1, 2017. This system includes the surface water
resources in the
Water Supply Status: Rainfall through October 2017 totaled 0.15 inches and brings the cumulative rainfall total for WY 2018 to 0.15 inches, which is 19% of the long-term average through October. Estimated unimpaired runoff during October totaled 554 acre-feet (AF) and brings the cumulative runoff total for WY 2018 to 554 AF, which is 19% of the long-term average through October. Usable storage for the MRWPRS was 29,860 acre-feet, which is 103% of average through October, and equates to 79% percent of system capacity
Production Compliance: Under
State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016
(CDO), California American Water (Cal-Am) is allowed
to produce no more than 8,310 AF of water from the Carmel River in WY 2018. Through October, using the CDO accounting method,
Cal-Am has produced 532 AF from the
Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.) In addition, under the Seaside Basin
Decision, Cal-Am is allowed to produce 1,820 AF of
water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the
Seaside Basin in WY 2018. Through October, Cal-Am has produced 368 AF from the Seaside Groundwater
Basin. Through October, 0 AF of Carmel River Basin groundwater
have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, and 0 AF have been diverted under Table 13 water rights. Cal-Am has produced 928 AF for customer use from all sources through October. Exhibit 24-C shows
production by source. Some of the
values in this report may be revised in the future as
Cal-Am finalizes their production values and monitoring data.
EXHIBITS
24-A Water Supply Status: November 1, 2017
24-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: WY 2018
24-C Monthly Cal-Am production by source: WY 2018
U:\staff\Boardpacket\2017\20171113\InfoItems\24\Item-24.docx