ITEM: |
INFORMATIONAL
ITEMS/STAFF REPORT |
||||
|
|||||
26. |
MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION
REPORT |
||||
|
|||||
Meeting Date: |
April 16, 2018 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|
||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection
of Natural Resources. |
|||||
Exhibit 26-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of April 1, 2018. This system includes the surface water
resources in the
Water Supply Status: Rainfall through March 2018 totaled 5.99 inches and brings the cumulative rainfall total for WY 2018 to 12.07 inches, which is 64% of the long-term average through March. Estimated unimpaired runoff during March totaled 9,221 acre-feet (AF) and brings the cumulative runoff total for WY 2018 to 15,604 AF, which is 30% of the long-term average through March. Usable storage for the MRWPRS was 31,110 acre-feet, which is 97% of average through March, and equates to 83% percent of system capacity
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 8,310 AF of water from the Carmel River in WY 2018. Through March, using the CDO accounting method, Cal-Am has produced 2,979 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,820 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2018. Through March, Cal-Am has produced 1,643 AF from the Seaside Groundwater Basin. Through March, 341 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, and 98 AF have been diverted under Table 13 water rights. Cal-Am has produced 4,538 AF for customer use from all sources through March. Exhibit 26-C shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data. The 12 month moving average of production for customer service is 9,955 AF, which is below the rationing trigger of 10,130 AF for WY 2018.
EXHIBITS
26-A Water Supply Status: April 1, 2018
26-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: WY 2018
26-C Monthly Cal-Am production by source: WY 2018
U:\staff\Boardpacket\2018\20180416\InfoItems\26\Item-26.docx