ITEM: |
INFORMATIONAL
ITEMS/STAFF REPORTS |
||||
|
|||||
31. |
MONTHLY WATER
SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
May 20, 2019 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|
||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection
of Natural Resources. |
|||||
Exhibit 31-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of May 1, 2019. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through April 2018 totaled 0.46 inches and brings
the cumulative rainfall total for WY 2019 to 28.92 inches, which is 141%
of the long-term average through April. Estimated unimpaired runoff during April totaled 8,482 acre-feet (AF)
and brings the cumulative runoff total for WY 2019 to 134,060 AF, which is
219% of the long-term average through
April. Usable storage for the MRWPRS was 31,980 acre-feet, which is 100% of average through April, and equates to 85% percent of system capacity
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 8,310 AF of water from the Carmel River in WY 2019. Through April, using the CDO accounting method, Cal-Am has produced 4,117 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,820 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2019. Through April, Cal-Am has produced 1,478 AF from the Seaside Groundwater Basin. Through April, 1,231 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, and 371 AF have been diverted under Table 13 water rights. Cal-Am has produced 5,068 AF for customer use from all sources through April. Exhibit 31-C shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data. The 12 month moving average of production for customer service is 9,762 AF, which is below the rationing trigger of 10,130 AF for WY 2019.
EXHIBITS
31-A Water Supply Status: May 1,
2019
31-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: WY 2019
31-C Monthly Cal-Am production by source: WY 2019
U:\staff\Boardpacket\2019\20190520\InfoItems\31\Item-31.docx