ITEM: |
INFORMATIONAL
ITEMS/STAFF REPORT |
||||
|
|||||
38. |
MONTHLY WATER SUPPLY AND
CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
June 17, 2019 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection
of Natural Resources. |
|||||
Exhibit 38-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of June 1, 2019. This system includes the surface water
resources in the
Water Supply Status: Rainfall through May 2019 totaled 2.01 inches and brings the cumulative rainfall total for WY 2019 to 30.93 inches, which is 147% of the long-term average through May. Estimated unimpaired runoff
during May totaled 5,688 acre-feet
(AF) and brings the cumulative runoff total for WY 2019 to 139,748 AF, which is 216%
of the long-term average through May. Usable storage for the MRWPRS was 31,760 acre-feet, which is 101% of average through May, and equates to 84% percent of system capacity
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 8,310 AF of water from the Carmel River in WY 2019. Through May, using the CDO accounting method, Cal-Am has produced 6,432 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,820 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2019. Through May, Cal-Am has produced 1,459 AF from the Seaside Groundwater Basin. Through May, 1,335 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, and 371 AF have been diverted under Table 13 water rights. Cal-Am has produced 5,916 AF for customer use from all sources through May. Exhibit 38-C shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data. The 12 month moving average of production for customer service is 9,732 AF, which is below the rationing trigger of 10,130 AF for WY 2019.
EXHIBITS
38-A Water Supply Status: June 1, 2019
38-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: WY 2019
38-C Monthly Cal-Am production by source: WY 2019 U:\staff\Boardpacket\2019\20190617\InfoItems\38\Item-38.docx