ITEM:

INFORMATIONAL ITEM/STAFF REPORT

 

24.

MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT

 

Meeting Date:

August 19, 2019

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

N/A

 

General Manager

Line Item No.:

 

 

 

Prepared By:

Jonathan Lear

Cost Estimate:

N/A

 

General Counsel Review:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  Exempt from environmental review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater Basin adjudication decision, as amended and Section 15268 of the California Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exhibit 24-A shows the water supply status for the Monterey Peninsula Water Resources System (MPWRS) as of August 1, 2019.  This system includes the surface water resources in the Carmel River Basin, the groundwater resources in the Carmel Valley Alluvial Aquifer and the Seaside Groundwater Basin.  Exhibit 24-A is for Water Year (WY) 2019 and focuses on four factors: rainfall, runoff, and storage.  The rainfall and Streamflow values are based on measurements in the upper Carmel River Basin at Sleepy Hollow Weir. 

 

Water Supply Status:  Rainfall through July 2019 totaled 0 inches and brings the cumulative rainfall total for WY 2019 to 30.93 inches, which is 146% of the long-term average through July.  Estimated unimpaired runoff through June totaled 1,533 acre-feet (AF) and brings the cumulative runoff total for WY 2019 to 144,291 AF, which is 216% of the long-term average through July.  Usable storage for the MRWPRS was 30,280 acre-feet, which is 101% of average through July, and equates to 82% percent of system capacity 

 

Production Compliance:  Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 8,310 AF of water from the Carmel River in WY 2019.  Through July, using the CDO accounting method, Cal-Am has produced 6,281 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.)  In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,820 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2019.  Through July, Cal-Am has produced 2,023 AF from the Seaside Groundwater Basin.  Through July, 1,335 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, and 471 AF have been diverted under Table 13 water rights.  Cal-Am has produced 7,819 AF for customer use from all sources through July.  Exhibit 24-C  shows production by source.  Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.  The 12 month moving average of production for customer service is 9,724 AF, which is below the rationing trigger of 10,130 AF for WY 2019.

 

EXHIBITS

24-A    Water Supply Status: August 1, 2019

24-B    Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins:  WY 2019

24-C    Monthly Cal-Am production by source: WY 2019

 

 

U:\staff\Boardpacket\2019\20190819\InfoItems\24\Item-24.docx