CEQA Compliance:  Exempt from environmental review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater Basin adjudication decision, as amended and Section 15268 of the California Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exhibit 43-A shows the water supply status for the Monterey Peninsula Water Resources System (MPWRS) as of May 1, 2020.  This system includes the surface water resources in the Carmel River Basin, the groundwater resources in the Carmel Valley Alluvial Aquifer and the Seaside Groundwater Basin.  Exhibit 43-A is for Water Year (WY) 2020 and focuses on four factors: rainfall, runoff, and storage.  The rainfall and Streamflow values are based on measurements in the upper Carmel River Basin at Sleepy Hollow Weir. 

 

Water Supply Status:  Rainfall through May 2020 totaled 0.18 inches and brings the cumulative rainfall total for WY 2020 to 17.57 inches, which is 84% of the long-term average through May.  Estimated unimpaired runoff through May totaled 3,683 acre-feet (AF) and brings the cumulative runoff total for WY 2020 to 43,047 AF, which is 66% of the long-term average through May.  Usable storage for the MRWPRS was 29,290 acre-feet, which is 92% of average through May, and equates to 88% percent of system capacity 

 

Production Compliance:  Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 8,310 AF of water from the Carmel River in WY 2020.  Through May, using the CDO accounting method, Cal-Am has produced 4,914 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.)  In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,820 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2020.  Through May, Cal-Am has produced 1,538 AF from the Seaside Groundwater Basin.  Through March, 917 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, and 218 AF have been diverted under Table 13 water rights.  Cal-Am has produced 5,966 AF for customer use from all sources through May.  Exhibit 43-C shows production by source.  Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.  The 12-month moving average of production for customer service is 9,772 AF, which is below the rationing trigger of 10,130 AF for WY 2020.

 

EXHIBITS

43-A    Water Supply Status: June 1, 2020

43-B    Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: WY 2020