ITEM: |
PUBLIC HEARING |
||||
|
|||||
16. |
CONSIDER
ADOPTION OF OCTOBER THROUGH DECEMBER 2020 QUARTERLY WATER SUPPLY STRATEGY AND
BUDGET |
||||
|
|||||
Meeting Date: |
September 21, 2020 |
Budgeted:
|
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|
||
|
|||||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee
Recommendation: N/A |
|||||
CEQA
Compliance: CEQA Compliance: Notice of Exemption, CEQA, Article 19,
Section 15301 (Class 1) |
|||||
ESA
Compliance: Consistent with the September 2001 and February 2009 Conservation
Agreements between the National Marine Fisheries Service and California
American Water to minimize take of listed steelhead in the Carmel River and
Consistent with SWRCB WR Order Nos. 95-10, 98-04, 2002-0002, and 2016-0016. |
|||||
SUMMARY: The Board will accept public comment
and take action on the October through December 2020 Quarterly Water Supply Strategy and Budget for California
American Waters (Cal-Ams) Main
System within the Monterey
Peninsula Water Resources System (MPWRS). The proposed budget, which are included
as Exhibits 16-A, shows monthly
production by source of supply that is required
to meet projected
customer demand in Cal-Ams Main System during the October through December 2020 period. The proposed strategy
and budget is designed
to maximize the long-term
production potential
and protect the environmental quality of the Seaside Groundwater and
Carmel River Basins.
Exhibit 16-A shows the anticipated production by Cal-Ams Main system for each production source and the actual production values for the water year to date through the end of December
2020. Cal-Ams
annual Main system production for Water Year (WY) 2021 will not exceed 9,784 acre-feet
(AF). Sources available to meet
customer demand are 1,474 AF from the Coastal
Subareas of the Seaside
Groundwater Basin
as set by the Seaside Basin Adjudication Decision and 8,310 AF from the Carmel
River as set by WRO 2016-16. I should be
noted that there are several CDO milestones that if missed could potentially
reduce the Effective Diversion Limit on the Carmel River by 1,000 AF per missed
milestone. There are potentially 2
milestones that could affect WY 2021.
The current water budget does not assume these reductions, but they will
be taken into account in the future quarters if they are enacted. If production for September 2020 occurs as planned, Cal-Am will enter WY 2021 with
approximately 1,190 AF of carry over ASR storage. This carryover was planned at the WY 2020 4th
quarter QWB meeting to provide an excess source of water in summer 2021 if
conditions are drier than WY 2020. The schedule of production from the Carmel Valley Alluvial Aquifer is consistent with State Water Resources Control Board (SWRCB)
Order Nos. 95-10, 98-04, 2002-0002, and 2016-0016. In compliance with WRO 2016-0016, any water diverted under these rights must be used to reduce
unlawful diversion from the Carmel River
Basin. This Quarterly Water Budget also
has Cal-Am scheduled to produce Pure Water Monterey Water roughly on the
schedule that the highly purified water is injected into the Seaside
Groundwater Basin.
RECOMMENDATION: The Board should receive public input, close the Public Hearing,
and discuss the proposed
quarterly water supply budget. District
staff recommends adoption of the proposed budget. The budget is described
in greater detail
in Exhibit 16-B, Quarterly
Water Supply Strategy
Report: October December
2020.
BACKGROUND: The Water Supply Strategy and Budget prescribes production within Cal-Ams Main and Laguna Seca Subarea systems
and is developed on a quarterly schedule. Staff from the District, Cal-Am, the National
Marine Fisheries Services (NMFS), State Water Resources Control Boards Division of Water Rights
(SWRCB-DWR), and the California Department of Fish and Wildlife (CDFW) cooperatively develop this strategy
to comply with regulatory requirements and maximize the environmental health of
the resource system while meeting customer demand. To the greatest extent pumping in the Carmel
Valley is minimized in the summer months and the Seaside wells are used to meet
demand by recovering native water and banked Carmel River water. Also, it was agreed that Cal-Am will operate its wells in the Lower Carmel Valley in a downstream to upstream order.
When flows
decline below 20 cfs at the Districts Don Juan Gage, Cal-Am will stop
production from its Upper Carmel Valley Wells.
The permitted diversion
season for ASR is between December 1 and May 31. ASR recovery will begin when flows decline to
shift production away from the river. Pure Water Monterey recovery will also be used
to shift pumping away from the river during the Low-Flow Period and will be
recovered roughly at the rate it is injected because the injection of purified
water writes down the Effective Diversion Limit for the Carmel River as the
water is injected. This schedule is
estimated with normal year streamflow conditions and daily demand for Carmel Valley. There is also a projected
goal of producing 25 AF of treated brackish
groundwater from the Sand City Desalination Plant
in each of these three months. The group did discuss reducing this amount,
but the majority of the entities decided to keep the goal of 25 AF per month to
reduce pumping on the Carmel River to the maximum extent possible.
Rule 101, Section
B of the District
Rules and Regulations requires that a Public Hearing be held at the time of determination of the District water supply management strategy. Adoption of the quarterly water supply
strategy and budget is categorically exempt
from the California Environmental Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class 1). A Notice
of Exemption will be filed with
the Monterey County Clerk's office, pending Board
action on this item.
16-A Quarterly
Water Supply Strategy and Budget for Cal-Am Main System: October
December 2020
16-B Quarterly Water
Supply Strategy
and Budget Report: October
December 2020
U:\staff\Boardpacket\2020\20200921\PublicHearings\16\Item-16.docx