ITEM: |
INFORMATIONAL ITEM/STAFF
REPORT |
||||
|
|||||
28. |
MONTHLY WATER SUPPLY AND
CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
September 21, 2020 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for
Protection of Natural Resources. |
|||||
Exhibit 28-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of September 1, 2020. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through August 2020 totaled 0.00 inches and brings
the cumulative rainfall total for WY 2020 to 17.57 inches, which is 83%
of the long-term average through August. Estimated unimpaired runoff through August totaled 380 acre-feet (AF)
and brings the cumulative runoff total for WY 2020 to 45,958 AF, which is 68% of the long-term average through August.
Usable storage for the MRWPRS was 27,980
acre-feet, which is 93% of
average through August, and equates
to 84% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 8,310 AF of water from the Carmel River in WY 2020. Through August, using the CDO accounting method, Cal-Am has produced 6,607 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,820 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2020. Through August, Cal-Am has produced 1,882 AF from the Seaside Groundwater Basin. Through August, 917 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 430 AF have been recovered for customer use, and 218 AF have been diverted under Table 13 water rights. Cal-Am has produced 8,799 AF for customer use from all sources through August. Exhibit 28-C shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data. The 12-month moving average of production for customer service is 9,702 AF, which is below the rationing trigger of 10,130 AF for WY 2020.
EXHIBITS
28-A Water Supply Status: September
1, 2020
28-B Monthly Cal-Am Diversions from Carmel River and Seaside Groundwater Basins: WY 2020
28-C Monthly Cal-Am production by source: WY 2020
U:\staff\Boardpacket\2020\20200921\InformationalItems\28\Item-28.doc