ITEM: |
PUBLIC HEARING |
||||
|
|||||
11. |
CONSIDER ADOPTION OF JANUARY THROUGH MARCH 2021 QUARTERLY
WATER SUPPLY STRATEGY AND BUDGET |
||||
|
|||||
Meeting Date: |
December 14, 2020 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|
||
|
|||||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review:
N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance: Notice
of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|||||
ESA Compliance: Consistent with the September 2001 and
February 2009 Conservation Agreements between the National Marine Fisheries
Service and California American Water to minimize take of listed steelhead in
the Carmel River and Consistent with SWRCB WR Order Nos. 95-10, 98-04,
2002-0002, and 2016-0016. |
|||||
SUMMARY: The Board will accept public comment
and take action on the January through March
2021 Quarterly Water Supply Strategy and Budget for California
American Waters (Cal-Ams) Main
System within the Monterey
Peninsula Water Resources System (MPWRS). The proposed budget, which are included
as Exhibits 11-A, shows monthly
production by source of supply that is required
to meet projected
customer demand in Cal-Ams Main System during the January through March 2021 period. The proposed strategy
and budget is designed
to maximize the long-term
production potential
and protect the environmental quality of the Seaside Groundwater and
Carmel River Basins.
Exhibit 11-A shows the anticipated production by Cal-Ams Main system for each production source and the actual production values for the water year to date through the end of March 2021. Cal-Ams annual Main system production for Water Year (WY) 2021 will not exceed 8,784 acre-feet
(AF). Sources available to meet
customer demand are 1,474 AF from the Coastal
Subareas of the Seaside
Groundwater Basin
as set by the Seaside Basin Adjudication Decision and 7,310 AF from the Carmel
River as set by WRO 2016-16. I should be
noted that there are several CDO milestones that if missed could potentially
reduce the Effective Diversion Limit on the Carmel River by 1,000 AF per missed
milestone. There has been one reduction
of 1,000 AF carried out in WY 2021. There is potentially one more milestone
that could affect WY 2021. The current
water budget does not assume the second reduction, but they will be taken into
account in the future quarters if they are enacted. Cal-Am will began WY 2021 with approximately 1,190
AF of carry over ASR storage. This
carryover was planned at the WY 2020 4th quarter QWB meeting to
provide an excess source of water in summer 2021 if conditions are drier than
WY 2020. The schedule of production from the Carmel Valley Alluvial Aquifer is consistent with State Water Resources Control Board (SWRCB)
Order Nos. 95-10, 98-04, 2002-0002, and 2016-0016. In compliance with WRO 2016-0016, any water diverted under these rights must be used to reduce
unlawful diversion from the Carmel River
Basin. This Quarterly Water Budget also
has Cal-Am scheduled to produce Pure Water Monterey Water roughly on the
schedule that the highly purified water is injected into the Seaside
Groundwater Basin.
RECOMMENDATION: The Board should receive public input, close the Public Hearing,
and discuss the proposed
quarterly water supply budget. District
staff recommends adoption of the proposed budget. The budget is described
in greater detail
in Exhibit 11-B, Quarterly
Water Supply Strategy
Report: January
to March 2021.
BACKGROUND: The Water Supply Strategy and Budget prescribes production within Cal-Ams Main and Laguna Seca Subarea systems
and is developed on a quarterly schedule. Staff from the District, Cal-Am, the National
Marine Fisheries Services (NMFS), State Water Resources Control Boards Division of Water Rights
(SWRCB-DWR), and the California Department of Fish and Wildlife (CDFW) cooperatively develop this strategy
to comply with regulatory requirements and maximize the environmental health of
the resource system while meeting customer demand. To the greatest extent pumping in the Carmel
Valley is minimized in the summer months and the Seaside wells are used to meet
demand by recovering native water and banked Carmel River water. Also, it was agreed that Cal-Am will operate its wells in the Lower Carmel Valley in a downstream to upstream order.
When flows
decline below 20 cfs at the Districts Don Juan Gage, Cal-Am will stop
production from its Upper Carmel Valley Wells.
The permitted diversion
season for ASR is between December 1 and May 31. ASR recovery will begin when flows decline to
shift production away from the river. Pure Water Monterey recovery will also be used
to shift pumping away from the river during the Low-Flow Period and will be
recovered roughly at the rate it is injected because the injection of purified
water writes down the Effective Diversion Limit for the Carmel River as the
water is injected. This schedule is
estimated with normal year streamflow conditions and daily demand for Carmel
Valley. There is also a projected
goal of producing 25 AF of treated brackish
groundwater from the Sand City Desalination Plant
in each of these three months. The group did discuss reducing this amount,
but the majority of the entities decided to keep the goal of 25 AF per month to
reduce pumping on the Carmel River to the maximum extent possible.
Rule 101, Section
B of the District
Rules and Regulations requires that a Public Hearing be held at the time of determination of the District water supply management strategy. Adoption of the quarterly water supply
strategy and budget is categorically exempt
from the California Environmental Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class 1). A Notice
of Exemption will be filed with
the Monterey County Clerk's office, pending Board
action on this item.
11-A Quarterly Water Supply Strategy and Budget for Cal-Am Main System: January March 2021
11-B Quarterly Water Supply Strategy and
Budget Report: January March 2021
U:\staff\Boardpacket\2020\20201214\PublicHearing\11\Item-11.docx